Delivering a hydraulic solution for an international mining operation working at the far edge of the map is about more than components and specifications.
It's about engineering a reliable outcome for a high-stakes operation where downtime is costly, logistics are difficult, and failure is unthinkable.
In our latest case study, we look at Berendsen’s work on hydraulic systems for the fleet of split barges used for overburden disposal by a large customer in Lihir, Papua New Guinea.
With systems built and factory tested in Brisbane, installed in Batam, and finally commissioned on site in PNG, Berendsen’s role spans design, manufacture, testing, and commissioning across multiple countries and operating environments.
Read the full case study here: https://berendsen.com.au/resources/split-barge-hydraulic-systems-for-large-lihir-based-mining-operation/