BHEL Engineering

BHEL Engineering Mobile line boring & on-site machining services across WA. We bring the workshop to your site.

Over 18 years of experience in precision bore repairs, facing, bush installation, and light fabrication.

26/05/2026

Komatsu PC850 boom line boring completed, restoring structural accuracy and strength to keep operations smooth and dependable in demanding conditions.
πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

25/05/2026

CAT 950H quick hitch line boring completed, restoring strength and precise fitment to ensure smooth and reliable operations on site.
πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

12/05/2026

Steering bracket line boring completed, restoring precise alignment for smooth handling and dependable control on site.
πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

11/05/2026

EX2600 Hitachi New Build Bucket Line Boring Completed β€” engineered for accuracy, durability, and peak performance in demanding mining conditions. Built to handle heavy-duty operations with precision and reliability on every cycle.

πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [[email protected]](mailto:[email protected])

08/05/2026

Dump truck chassis bore completed, restoring structural strength and precise alignment for smooth operation and long-lasting reliability in demanding conditions.

πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

04/05/2026

Long Reach Stick Line Boring completed with precision, restoring accurate alignment and performance for smooth extended reach operations with maximum efficiency.

πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

02/05/2026

980K Centre Hitch Line Boring Completed, Bringing Back Precision for Smooth and Efficient Operation

πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

Hydra Grab Line Boring Completed β€” Restoring precision and strength for dependable heavy-duty performance πŸ”§Precision eng...
28/04/2026

Hydra Grab Line Boring Completed β€” Restoring precision and strength for dependable heavy-duty performance πŸ”§

Precision engineering ensures your machine is back to peak alignment and ready for tough site operations without compromise.

πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

PC1250 boom and H links line boring completed, restoring alignment and strength so the machine is ready to perform from ...
22/04/2026

PC1250 boom and H links line boring completed, restoring alignment and strength so the machine is ready to perform from day one on site.

πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

21/04/2026

H-link line boring completed with precision, restoring strength and correct alignment so it’s ready to handle heavy-duty work without compromise.

πŸ“ Serving Perth | Goldfields | Pilbara | Newman
πŸ“ž (08) 6118 0954
πŸ“© [email protected]

Address

Perth
Perth, WA
6000

Alerts

Be the first to know and let us send you an email when BHEL Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share