31/03/2026
Project Highlight | Flow Meter Skids for Mining Operations
Another successful delivery completed! 👏 We’ve dispatched five DN400 and one DN600 flow meter skids, delivering a full end‑to‑end engineering and integration scope for a mining operation.
What we delivered:
▪️ Endress+Hauser Promag W10 flowmeters for accurate and reliable measurement
▪️ Heavy‑duty galvanised steel skids, complete with 360° rotating solar panels for off‑grid operation
▪️ Fully integrated control panels incorporating solar regulators, telemetry and surge protection
▪️ Citect SCADA integration, with commissioning completed on site
Each skid was engineered as a complete, ready‑to‑run solution — from detailed design and FAT right through to final commissioning and handover.