Kenley Steam and Ironwork

Kenley Steam and Ironwork Machining, Fabrication and blacksmiths servicing Agricultural, Industrial and Domestic 'one off' pro

Marshall traction engine strip down in progress for a new firebox. For a 126 year old engine it is in pretty good condit...
17/05/2026

Marshall traction engine strip down in progress for a new firebox. For a 126 year old engine it is in pretty good condition overall and has come apart pretty easy.

A great day as always with the owners coming to lend a hand and Steaming on the Downs Inc.

Haven't posted anything for a while, but here are a few photos and updates in some recent works:- 12" Vertical Boiler pr...
21/04/2026

Haven't posted anything for a while, but here are a few photos and updates in some recent works:

- 12" Vertical Boiler prototype complete (more details to come on an upcoming production run of these units)
- 2 x Wallis Traction Engines now mechanically complete and into the paint shop
- New tapered we***ck steel locomotive boiler for a 7.25" Black 5
- Briggs Boiler for 4.5" scale Allchin Traction Engine
- We***ck Steel Boiler for a 7.25" gauge LBSC Rainhill
- Partial build on a 7.25" gauge BB18.25 Tender
- Recommissioning works on customers locomotive

See us for all your live steam and heritage boiler requirements

Out of the Erecting Shop and into the Paint Shop. First time it's seen daylight!No. 1 is now mechanically complete!
02/03/2026

Out of the Erecting Shop and into the Paint Shop. First time it's seen daylight!

No. 1 is now mechanically complete!

We have had a lot of interest in how we have rubbered the wheels for the Wallis engines so I thought a post explaining t...
20/02/2026

We have had a lot of interest in how we have rubbered the wheels for the Wallis engines so I thought a post explaining the process we follow might be helpful. There are many ways of doing this but this is the method we follow.

Captions on each photo explain the steps...

More wheels rubbered.
05/02/2026

More wheels rubbered.

Ready for the road....The buffalo Pitts boiler project has finished with us and is off back to its owners for tubing and...
26/01/2026

Ready for the road....

The buffalo Pitts boiler project has finished with us and is off back to its owners for tubing and reassembly.

It's been a mammoth project and a massive learning curve... A big thanks to the members of Steaming on the Downs Inc. for their tireless assistance and skill on riveting days.

Here are a few photos from commencement in September 2024 till now

Bit of a trend of tube plates recently... Aveling roller front tube plate and vertical boiler tube plate getting tube ho...
09/01/2026

Bit of a trend of tube plates recently... Aveling roller front tube plate and vertical boiler tube plate getting tube holes cut in.

07/01/2026

Drilling tube holes in a 7.25" we***ck hunslet boiler. Note the prototypical raised firebox. Customer supplied prepped plate work. Welding all completed in house.

Merry Christmas to our many valued customers, followers, fellow steam and model engineering enthusiasts!2025 has been a ...
25/12/2025

Merry Christmas to our many valued customers, followers, fellow steam and model engineering enthusiasts!

2025 has been a big year, but 2026 promises to be even bigger! Even snuck in some sneaky Christmas Morning machining....

Have a great festive season and we will see you all in 2026!
🎁 🎄 🍻

Freshly rubbered wheels on the first of the Wallis engines. 10mm thick material applied in 2 layers using 2 Pac adhesive...
09/11/2025

Freshly rubbered wheels on the first of the Wallis engines.

10mm thick material applied in 2 layers using 2 Pac adhesive then ground to profile

30/10/2025

'Boring' sort of job 😆

Address

Kingsthorpe Silverleigh Road
Oakey, QLD
4401

Website

Alerts

Be the first to know and let us send you an email when Kenley Steam and Ironwork posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Kenley Steam and Ironwork:

Share