12/03/2026
Job done and finished for 600 engineering at 600 engineering today
Design and build a partition in this tipper to enable dropping 2 loads of 2 cubic metres of firewood at two different locations
600’s client will be putting it to work tomorrow delivering firewood in the Yarra Valley