Steel Frames Direct Pty Ltd

Steel Frames Direct Pty Ltd Melbourne's light gauge steel frame manufacturer, servicing the residential building industry.

Happy Easter from the teamWishing all our valued clients and partners a safe and enjoyable break over the Easter period....
04/04/2026

Happy Easter from the team

Wishing all our valued clients and partners a safe and enjoyable break over the Easter period.

We appreciate your continued support and look forward to working together on upcoming projects.

Enjoy the time with family, recharge, and stay safe.

– The Team

26/03/2026

STEEL FRAMES DIRECT P/L













WE’RE HIRING – WAREHOUSE / ASSEMBLY TEAMOngoing full-time work in Deer Park.Great team, steady hours.📞 Call Tony on 0405...
01/02/2026

WE’RE HIRING – WAREHOUSE / ASSEMBLY TEAM
Ongoing full-time work in Deer Park.
Great team, steady hours.

📞 Call Tony on 0405 171 315 if you’re interested.

Steel Frames Direct has officially commenced works on the upper level structure for the Armstrong Creek Childcare and co...
29/11/2025

Steel Frames Direct has officially commenced works on the upper level structure for the Armstrong Creek Childcare and commercial retail development, delivering a full LGS package with structural steel integration, precision detailing and an efficient install sequence to keep the project moving. Another quality build underway with our team driving accuracy, speed and reliability from the ground up

We’ve just wrapped up this stunning Spanish-style villa in Berwick — a project that tested both our design and installat...
13/11/2025

We’ve just wrapped up this stunning Spanish-style villa in Berwick — a project that tested both our design and installation capabilities to the fullest.

The intricate detailing and unique architectural curves made this build as challenging as it was rewarding. Every line and junction had to be executed with absolute precision — but the result speaks for itself.

Set against a remarkable, tree-lined landscape, this frame stands tall as a benchmark for the area — showcasing how strong design and skilled installation can complement a truly timeless setting.

From concept to completion, the structure reflects our team’s dedication to quality, innovation, and the craft of light gauge steel framing done right.

TRUECORE steel

Stair Tower ModularThe second stair tower module is ready to be transported out to site at Laverton Data centre, where i...
06/11/2025

Stair Tower Modular

The second stair tower module is ready to be transported out to site at Laverton Data centre, where it will be craned directly off the truck for safe and direct access between levels.

Engineered to last, our modular stair towers deliver major cost savings compared to expensive hire systems and prevent the blowouts that come with traditional site-built access. Fast, efficient, and built to perform.

Smart access. Smarter savings.

https://www.steelframesdirect.com.au/

Modular Tiny HomeWe are currently manufacturing and assembling one of three modules that will be joined on site to form ...
04/11/2025

Modular Tiny Home

We are currently manufacturing and assembling one of three modules that will be joined on site to form a complete modular tiny home. By constructing in modules, we deliver significant savings in time, money and avoid unexpected cost blowouts. Modular housing provides faster build times, consistent quality through factory production and efficient installation on site.

This project comprises a kitchen with open living, two bedrooms, a bathroom and a laundry, all designed to be seamlessly connected once delivered. The future of building is modular.

steel

https://www.steelframesdirect.com.au/

# ModernLiving

Before & After – Scania Office Upgrade12 months ago, alongside Workspace 360, we delivered a complete office upgrade for...
23/10/2025

Before & After – Scania Office Upgrade

12 months ago, alongside Workspace 360, we delivered a complete office upgrade for Scania – transforming their space into a modern, functional workplace.

From planning right through to handover, our team worked closely with Workspace 360 to bring the vision to life, ensuring Scania’s staff now enjoy a sleek, efficient office that supports their daily operations.

Great to look back one year on and see the results still standing strong.

https://www.steelframesdirect.com.au/

✅ Project UpdateBoth of our custom stair tower modules have now been completed at our Deer Park facility and are officia...
09/09/2025

✅ Project Update

Both of our custom stair tower modules have now been completed at our Deer Park facility and are officially ready for deployment to site. These units have been fully clad (walls and roof) to handle the toughest conditions and ensure safe, reliable temporary access for our clients.

Strong. Efficient. Site-ready
construction

We have completed both custom stair tower modules at our Deer Park warehouse, ready to provide temporary access on site....
04/09/2025

We have completed both custom stair tower modules at our Deer Park warehouse, ready to provide temporary access on site. Each unit has been fully clad on all walls and the roof to ensure long-lasting durability, full weather protection and complete operational functionality.

Built for strength. Designed for efficiency. Ready for site.
construction

Address

Orica Building Gate 6 Warehouse 4, Tilburn Road Deer Park
Melbourne, VIC
3023

Alerts

Be the first to know and let us send you an email when Steel Frames Direct Pty Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Steel Frames Direct Pty Ltd:

Share