Mobile Engineering Solutions Tasmania

Mobile Engineering Solutions Tasmania We offer onsite machining, line boring, fabrication, custom 3D design, hydraulics, installation, mai

Completed a re-power this week. Thanks, Matty, for the great work in removing and replacing soft patches in the rain, an...
09/05/2026

Completed a re-power this week. Thanks, Matty, for the great work in removing and replacing soft patches in the rain, and Jim for all the long days and hard work.

Start of a re power last week and a few other jobs underway
01/05/2026

Start of a re power last week and a few other jobs underway

Another pump finished off this week and some work on a very sloppy 30T excavator
22/03/2026

Another pump finished off this week and some work on a very sloppy 30T excavator

Jobs on at MEST this month
07/03/2026

Jobs on at MEST this month

A productive start to the year. Appreciation to Matty P for handling the setup and commissioning of our pump in Broom; i...
06/02/2026

A productive start to the year. Appreciation to Matty P for handling the setup and commissioning of our pump in Broom; it wasn’t even that hot, apparently.

Entering the new year with multiple projects underway
09/01/2026

Entering the new year with multiple projects underway

A fuel transfer system setup this week
06/12/2025

A fuel transfer system setup this week

Another project run up today a lot of gear in a small space with good accessibility for maintenance
28/11/2025

Another project run up today a lot of gear in a small space with good accessibility for maintenance

We have successfully completed a major project this week. The new vessel Wildcat has been outfitted with a comprehensive...
21/11/2025

We have successfully completed a major project this week. The new vessel Wildcat has been outfitted with a comprehensive suite of net cleaning equipment. Furthermore, a Tier 3 emission compliant Kamat high pressure pump has been designed and constructed, with the installation of a high pressure water system. A notable achievement is the design and build of the first Cummins Qsl9 Tier 3 emission compliant marine spec generator in Australia. Installations of a vacuum recovery system and winch have also been completed. The design and installation of the operator station have been enhanced by BC Electrical's user-friendly PLC interface, modernizing the entire setup. The hydraulic system has been designed, with major components supplied to provide hydraulics to all onboard systems. The exceptional installation work by Briar Banks Engineering is acknowledged. Appreciation is extended to Matty P of Pearsall Marine for his substantial contributions to this project, as well as Jimmy for his quality work.

14/11/2025

Address

Margate
Hobart, TAS
7054

Telephone

0448262868

Website

Alerts

Be the first to know and let us send you an email when Mobile Engineering Solutions Tasmania posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share