Tortech

Call Directions Website Contact the business

Tortech - Total Transformer Solutions -

Manufacturing and supplying quality cast resin, oil filled distrib

Over 30 Years as Australia's Transformer Specialist and leading supplier of step down, isolation and conventional transformers for power supplies and isolation in medical, lighting, audio industrial transformer applications.

Project Showcase: 300kva transformer Designed for optimum temrperature rise Isolation construction Input 400v ph-ph volt...
24/07/2024

Project Showcase:
300kva transformer Designed for optimum temrperature rise Isolation construction Input 400v ph-ph voltage 50 Hz Output 690v ph-ph voltage Connection is Dyn AN cooling Outdoor application Enclosure rating IP56 Insulation Class H (180 Deg C) Standard: AS/NZS 60076 No circuit breaker Screen between input and output winding to reduce interference and transferred voltage surge. Weight:1600kg Size 1.2×1.1×1.4m

300kva Three phase Transformer project

https://www.tortech.com.au/merry-christmas-from-tortech-holiday-trading-notice/***HOLIDAY TRADING NOTICE 2023** CLOSED f...
18/12/2023

https://www.tortech.com.au/merry-christmas-from-tortech-holiday-trading-notice/
***HOLIDAY TRADING NOTICE 2023** CLOSED from 21/12/2023 – 15/01/2024 ( extended leave period this year)

We would like to thank all our team, our engineers, production and admin staff for your incredible hard work.

For our retail customers, couriers and suppliers please note these important trading dates

Last orders for delivery is 19th Dec.

Tortech will close from 21/12/2023 – 15/01/2024 ( extended leave period this year)

Orders received during this period will be processed after 15th Jan 2024.

Note: a Skeleton crew may assist with urgent enquiries and orders during this period.

To all our customers we return on Monday January the 15th 2023

Wishing you a great Christmas and Happy new year

Last orders for delivery is 19th Dec. Tortech will close from 21/12/2023 – 15/01/2024 Orders received during this period will be processed after 15th Jan 2024. To all our customers we return on Monday January the 15th 2023

This is new addition to the TORTECH High Voltage test bay for use in 2023! It is a 150kv rms coupling capacitor/ capacit...
02/01/2023

This is new addition to the TORTECH High Voltage test bay for use in 2023! It is a 150kv rms coupling capacitor/ capacitor decider. It is partial discharge free at 150kv and will be used to measure partial discharge up to 150kv on instrument transformers and power transformers. It will also measure HV voltages up to 150kv with an accuracy of 1%.
https://lnkd.in/gurwevmJ

2022 is a wrap and it has been an incredibly busy year at Tortech, with numerous large transformer projects completed.We...
24/12/2022

2022 is a wrap and it has been an incredibly busy year at Tortech, with numerous large transformer projects completed.

We would like to thank all our team, our engineers, production and admin staff for your incredible hard work.

To all our customers we return on Monday January the 9th 2023

Wishing you a great Christmas and Happy new year

One of the biggest questions we get are how are your tansformers different from those on the market?Tortech step down tr...
24/12/2022

One of the biggest questions we get are how are your tansformers different from those on the market?
Tortech step down transformers are rated at a continuous rating.
The main difference with Tortech Transformer is that they are rated to run 24 Hours a day!
There is NO duty cycle – (a limit of where a transformer can maintain a rating for 1 hour).
Tortech voltage converters can run CONTINUOSLY as the stated ratings. Read more: https://www.tortech.com.au/tortech-step-down-transformer-difference/

Our Single to three Phase Converters have had numerous design enhancements:1)New Input D curve Breaker on 240 Volts sing...
11/10/2022

Our Single to three Phase Converters have had numerous design enhancements:
1)New Input D curve Breaker on 240 Volts single phase – offering protection of the inductive circuit.
2) Improved electronic module with higher rated capacitors and bigger power rated controller with open box arrangement .
3) The new external boxes have an improved ventilation design, that allows for increased cooling and the Australian environment.
3) The air is fan forced across all components: transformer plus capacitors and switching triacs.
Read more https://lnkd.in/gqXNCDap

Michael Larkin our managing director is to present at Engineers Australia. Register below.
22/09/2022

Michael Larkin our managing director is to present at Engineers Australia. Register below.

Investigating the partial discharge testing of 3 phase transformers Explore the partial discharge testing techniques, circuits and test results on dry type 3 phase transformers

Address

Unit 4/31 Wentworth Street
Greenacre, NSW
2190

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+61296426003

Alerts

Be the first to know and let us send you an email when Tortech posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Tortech:

Shortcuts

Share