Trikk TIG

Trikk TIG Mobile TIG welding. 10 years experience in Metal Fabrication. Mild Steel, Stainless and Aluminium.

Ron’s ‘57 Chev 1/2 Ton Pick Up - Part 5The engine mounts have now been completed, and the engine is successfully mocked ...
11/11/2024

Ron’s ‘57 Chev 1/2 Ton Pick Up - Part 5

The engine mounts have now been completed, and the engine is successfully mocked up in preparation for the fitting of the transmission and the design of the crossmember.

Additionally, the custom bases for both the driver and passenger seats have been completed, along with the necessary floor reinforcement.

Back in the workshop, we've designed and fabricated set of custom rock sliders for Matt's ‘98 Chevrolet Suburban, precis...
15/09/2024

Back in the workshop, we've designed and fabricated set of custom rock sliders for Matt's ‘98 Chevrolet Suburban, precision-made with fully TIG welded 3mm steel tubing and finished matte black for a premium look.

Little 4x4 fab job for Dan this morning,New Jerry can holder and remodel of the interior shelves 🤟
29/05/2024

Little 4x4 fab job for Dan this morning,
New Jerry can holder and remodel of the interior shelves 🤟

Ron’s ‘57 Chev 1/2 Ton Pick Up - Part 4Complete welding and fitting of the upper chassis cross-brace.Thorough welding an...
23/05/2024

Ron’s ‘57 Chev 1/2 Ton Pick Up - Part 4

Complete welding and fitting of the upper chassis cross-brace.
Thorough welding and reinforcing of all tacked parts in the rear end, including 4-link mounts etc.

Custom Airbox and Intake with a Stainless 4” Snorkle, Built for Matt’s 1998 Chevrolet Suburban. • Complete 316 Stainless...
30/04/2024

Custom Airbox and Intake with a Stainless 4” Snorkle, Built for Matt’s 1998 Chevrolet Suburban.

• Complete 316 Stainless 4 inch snorkle
• KnN High Flow Pod Filter
• Aluminium Airbox
• 4” to 3.5” Stainless Pie-Cut Intake Pipe
• 10mm Acrylic Airbox Lid

Great project this one!

Ron’s ‘57 Chev 1/2 Ton Pick Up - Part 3Spent time finalising the tail shaft hoop before removing it to complete. Complet...
25/03/2024

Ron’s ‘57 Chev 1/2 Ton Pick Up - Part 3
Spent time finalising the tail shaft hoop before removing it to complete.
Complete mock up and tack in of 4-link rear end to test geometry and suspension.
Test fitted airbags
Also spent time reinforcing the chassis where the new front end and chassis meet.

Ron’s ‘57 Chev 1/2 Ton Pick-Up - Part 2Initial fabrication of the clearance hoop for tail shaft on the crossmember was c...
07/03/2024

Ron’s ‘57 Chev 1/2 Ton Pick-Up - Part 2

Initial fabrication of the clearance hoop for tail shaft on the crossmember was completed, as well as chassis plates for 4-link
Diff was mocked up to start layout of 4-link setup and plates were tacked in place.

Ron’s ‘57 Chev 1/2 Ton Pick-Up - Part 1Preparing chassis for C-Notch, got side and top laser cut plates welded in. The o...
03/03/2024

Ron’s ‘57 Chev 1/2 Ton Pick-Up - Part 1

Preparing chassis for C-Notch, got side and top laser cut plates welded in.
The original chassis could then be cut away.
All fully TIG welded.

Drum Smoker charcoal basket and ash catcher. Used large guage expanded mesh, raised off the ash catcher to aid airflow f...
07/02/2024

Drum Smoker charcoal basket and ash catcher.
Used large guage expanded mesh, raised off the ash catcher to aid airflow for more balanced heat in the smoker.
Can build any size and shape for your next project or upgrade your existing unit.

Firebird/Camaro chassis brace reinforment
05/02/2024

Firebird/Camaro chassis brace reinforment

Custom Enclosed Go-Kart Trailer BuildTapered nose with door.Split level Kart shelves with large gas ram rear door for ea...
01/02/2024

Custom Enclosed Go-Kart Trailer Build
Tapered nose with door.
Split level Kart shelves with large gas ram rear door for easy access and cover.
Covered with Aluminium sheet.

Address

Berwick, VIC

Website

Alerts

Be the first to know and let us send you an email when Trikk TIG posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share