$50 Facebook Challenge – Let’s Complete It? 💵🔥

Q: Capping material shall have a maximum particle size of 150 mm.A) TrueB) False
03/06/2026

Q: Capping material shall have a maximum particle size of 150 mm.

A) True
B) False

03/06/2026

Main Standards Every QC Inspector Must Know.

Q: How soon must lean concrete be poured after compaction is obtained and accepted before compaction results require rev...
03/06/2026

Q: How soon must lean concrete be poured after compaction is obtained and accepted before compaction results require revalidation?

A) Within 3 days
B) Within 2 days
C) As soon as possible, preferably within 1 day
D) Within 7 days

Q: For cohesionless soil, relative density is determined by:(Reference: ASTM D4253 / ASTM D4254)A) (e_{max}-e_{min})/eB)...
03/06/2026

Q: For cohesionless soil, relative density is determined by:
(Reference: ASTM D4253 / ASTM D4254)

A) (e_{max}-e_{min})/e
B) (e_{max}-e)/(e_{max}-e_{min})
C) (e-e_{min})/(e_{max}-e_{min})
D) (e_{max}+e_{min})/e

Q: Minimum compaction required for general fill when using machinery shall be:A) 85%B) 90%C) 95%D) 100%
02/06/2026

Q: Minimum compaction required for general fill when using machinery shall be:

A) 85%
B) 90%
C) 95%
D) 100%

02/06/2026

Daily me Questions pochta hn tky ap log study kare , Kuch study Start ki k nai ?
Engineers 🧑‍💻

Q: Compaction shall begin only after the fill or backfill has been properly placed and the material to be compacted is w...
02/06/2026

Q: Compaction shall begin only after the fill or backfill has been properly placed and the material to be compacted is within ______ of the optimum moisture content.

A) ±1%
B) ±2%
C) ±3%
D) ±5%

Q: For backfill of trenches, field density tests shall be performed at a minimum frequency of one test for every:(Refere...
02/06/2026

Q: For backfill of trenches, field density tests shall be performed at a minimum frequency of one test for every:
(Reference: SAES-A-114 )

A) 10 m
B) 15 m
C) 20 m
D) 25 m

Q: Required compaction for sub-base and base course shall be:A) 90% and 95%B) 95% and 98%C) 95% and 100%D) 98% and 100%
02/06/2026

Q: Required compaction for sub-base and base course shall be:

A) 90% and 95%
B) 95% and 98%
C) 95% and 100%
D) 98% and 100%