Geitgey Manufacturing

Geitgey Manufacturing As owner operators of mobile food units, we started building our own units. Now we build for others.

05/25/2026

This guy is set for delivery tomorrow, if you're looking for a build over this coming winter let us know if we can help.

04/30/2026

The top sign is complete and installed.

04/29/2026

We got the counters framed in, the upper shelves done, the roof trim on and the top marquee sign is framed.

We are moving on this, trying to get it finished up for this season.

04/07/2026

All the trailer lights are installed and tested. Instead of using plywood on our roof and covering it we used a 1/2 thick PVC panel, that will them be covered in aluminum. It is strong enough to walk on and will never rot from water damage.
We also finished the insulation in the unit and will begin putting the skin on the inside.

It's coming together quickly.

03/31/2026
03/26/2026

Full aluminum tub, no worries about subfloor rotting out on this guy. It's starting to look like a trailer.

03/21/2026

Took a little weekend time but we will be ready for an axle first of the week.

03/16/2026

Ya why not squeeze one in before this year gets too crazy.

This unit is going to be a 12 ft unit with a removable hitch on the serving end to make backing into spots easy, it will be very open with 2 5ft awnings on the sides and a 7 ft awning across the serving end.

This unit will have a solid 1/4 in aluminum floor to remove the element of wood rot, it's also going to have a 20in marquee. Keep an eye out for updates this should be a fun build

03/05/2026

When your material is 24 ft long and you only have 14 ft doors you have to get a little creative.

All the structural aluminum has been delivered.

03/05/2026

Material is coming in and we are getting ready to start another build, this one will have some cool new features so make sure you follow the updates.

01/13/2026

This is one of the trailers from last winter's builds, it returned for a top sign to really set it off. The customer wanted to install the lights and handle the wiring so we just built the frame and got it installed.

Can't wait to see what comes next.

Address

West Salem, OH
44287

Website

Alerts

Be the first to know and let us send you an email when Geitgey Manufacturing posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share