A Canadian gold mining operation used to shut down its primary crusher discharge conveyor for cleanup. Four workers. Four hours of shoveling. Lost production.
With Movex Innovation MINIDOZER Mini Loaders, that same job can be completed in about one hour with two operators while the conveyor keeps running.
The result: approximately 20,000 additional tons of ore produced per month.
This is what happens when you stop treating conveyor cleanup as a necessary evil and start treating it as an opportunity to improve Safety, uptime, and productivity.
Read the case study: https://hubs.li/Q04xZXTt0
See how a Gold Mine eliminated conveyor cleaning shutdowns and added 20,000 tons of monthly production using Movex’s M48 and M27 MINIDOZER.