02/14/2026
This past month has been busy doing demo work on this 20+ year old water filter tank for a company in Delaware. 2/4 tanks are almost done and plenty of welding to come. Professional confined space entry with lots of air movement and air testing.
The trickiest part is cutting every piece of the 3/4β inch flooring covered in 20 year old paint to size so it fits out through the 14βx18β manhole. These pieces are heavy roughly weighing 80lbs each. About 30 pieces cut and moved 3 times per tank. Lots of stuff going on!
Business has been great πΊπΈ