10/21/2026
FROM THE FIELD | MIDLAND BASIN
Eight wells. More than 10,000 feet of average plugged lateral. 441 composite plugs milled.
On this Midland Basin thru-tubing project, the Tejas Completion Services team delivered:
• 8-well pad
• 10,108' average plugged lateral
• 441 total composite plugs milled
• 55 median plugs per well
• 2.58 min average mill time
• 9.4 ft/min average ROP across the lateral
• 5.5–6.5 BPM pump rate
These are the kinds of field results that tell the TCS story: experienced crews, proven ex*****on, and performance you can measure. Real work. Real numbers. Real results.
Explore our thru-tubing services:
🔗 www.tejascompletionservices.com/services/thru-tubing-midland