03/19/2026
Project completed for our partners in WI,
The firs few days of a rough-in are never easy,
60 cables in, conduit installed for the difficult runs where nothing else would work, and the foundation was set.
The Build,
Rack mounted. UPS and two 48-port switch installed. Then came the repetition that separates the pros from the amateurs: punching down 60 ports at the patch panel and getting the first Access Points live.
The Final Push,
Once the cubicles were in place, we moved to the finish line. Routed the remaining cable, terminated the user ends, and labeled every single inch.
To prove the job was done right before the permanent ISP even arrived, we deployed a Starlink setup to bring the building online. Verified the network with remote support, confirmed everything was green, and cleaned the site.
Site cleared. Network ready for the client to plug and play user-end devices.