⚠️ Dogleg Severity (DLS): The Hidden Stress Point in Directional Drilling

In directional drilling, reaching the target is only part of the job — reaching it with a smooth and controlled wellbore is what makes the operation successful. 🛢️⚙️

Dogleg Severity shows how quickly the well path changes direction by combining changes in inclination and azimuth. A low DLS means a smoother trajectory, while high DLS can create serious drilling challenges.

🔹 Higher pipe stress
🔹 More torque and drag
🔹 Increased BHA and tool fatigue
🔹 Poor hole quality
🔹 Higher risk of stuck pipe and equipment failure

That’s why DLS control is critical for safer drilling, better wellbore quality, and improved overall drilling performance.

📌 Field Question: What is the highest DLS you have seen during drilling — and was it planned or unexpected?©️

10/06/2026

Modern Infrastructure:Understanding Soil Nail Systems and Deep Foundation Piles.

04/06/2026

Casagrande C6XP-2 for HumeLink East, New South Wales (Australia)

At the Bannaby Substation in New South Wales, the Casagrande C6XP-2 was used in micropile configuration for foundation trials related to the HumeLink East project, one of Australia’s major energy transmission infrastructure programs.

For this application, the C6XP-2 supported drilling operations for a micropiled precast foundation system, where a precast concrete cap transfers structural loads to 150–250 mm diameter micropiles made of high-strength mono bars grouted into rock.

Thank you to Acciona for choosing Casagrande equipment for this foundation application.

👉 Learn more about the Casagrande C6XP-2:
https://casagrandegroup.com/crawler-drills/xp-2-series-crawler-drills/c6/

_______________________

Casagrande C6XP-2 per il progetto HumeLink East, New South Wales (Australia)

Presso la Bannaby Substation, in New South Wales, la Casagrande C6XP-2 è stata utilizzata in configurazione micropali per le prove fondazionali legate al progetto HumeLink East, uno dei principali programmi australiani per le infrastrutture di trasmissione energetica.

In questo contesto, la C6XP-2 ha supportato le operazioni di perforazione per un sistema di fondazioni prefabbricate su micropali, in cui un plinto prefabbricato in calcestruzzo trasferisce i carichi strutturali a micropali di diametro compreso tra 150 e 250 mm, costituiti da barre ad alta resistenza fissate nella roccia.

Grazie ad Acciona per aver scelto l’attrezzatura Casagrande per questa applicazione fondazionale.

👉 Scopri la Casagrande C6XP-2:
https://casagrandegroup.com/it/perforatrici/serie-xp-2-perforatrici/c6/

ACCIONA

04/06/2026

Address

敬二街10號4樓
桃園區
33044

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00

Telephone

+88633254540

Website

Alerts

Be the first to know and let us send you an email when 益域機具設備有限公司 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to 益域機具設備有限公司:

Share