05/06/2026
🚀 Beyond Conventional PEB – Entering High-Rise Process Plant Structures
We are proud to showcase our involvement in the Oleochemical Steel Structure Project in Medan, Indonesia.
See our case study here: https://na2.hubs.ly/H05SXhR0
This is not a typical industrial building.
This is a 41-meter high multi-level process plant structure designed to support:
✔ Fatty Acid & Glycerine Distillation
✔ Bleaching & Hydrogenation Units
✔ Heavy-duty cooling tower at roof level
What makes this project truly challenging:
🔹 Heavy equipment installed at multiple elevations
🔹 Significant overturning effects from tall process towers
🔹 High seismic design requirement
🔹 Complex coordination with piping, MEP, and process systems
From a structural standpoint, this required a hybrid system combining braced frames and moment-resisting frames, far beyond conventional PEB applications.
💡 This project proves that PEB is not limited to warehouses.
It can be successfully extended into:
• Oleochemical & Chemical Plants
• Oil & Gas / Petrochemical Facilities
• Power Plants
• Cement & Mining Processing Plants
At Nova Buildings Group, we continue to push boundaries in delivering Complex Industrial Solutions.