IMMAX Engineering and Construction

IMMAX Engineering and Construction PCAB no. 45762 & PHILGEPS Accredited - Design, Contractor and Other Independent Contractors / Services

YOUR ONE-STOP DESIGN, BUILD, CONTRACTOR CONSTRUCTION COMPANY! Construction Design, Documentation and Estimate - Based on your proposed budget, we will develop a design concept that will suit your requirements. After the approval of the conceptual design, design detailing will follow which will include electrical, plumbing, structural and detailed architectural design. Bill of materials and detaile

d cost estimates will be prepared after the completion of detailed designs. Building Permit Application - We will apply building permit and will prepare all required engineering documents including sign and seal of respective professionals. We guarantee our strict adherence to the national building code and safety guidelines in the Philippines. Bank/Pagibig Loan Application - We will prepare all required technical documents for house construction bank loan or PAGIBIG loan. Construction Management and Supervision - We will supply all labor, materials, equipments, tools, transportation, supervisions and other items necessary for satisfactory completion of the work, including taxes required by the government. A Project Engineer will be assigned to supervise the construction site on a fulltime basis. We will constantly coordinate with you with regards to the progress of works and any concerns that may arise during the construction period. Water and Electricity Connection - We will process your application for permanent connection of water and electricity in the Philippines. Warranty - We will repair at our own cost any defects, leakages or other faults which shall appear due to poor materials and workmanship within twelve (12) months from the date of completion and 15 years for the structural.

16/02/2026

Hiring:

Tiles setter
Mason
Painter

Project site at Lipa City Batangas
Pls contact: 09566970752
For more details.

07/02/2026

โ€œAkala ko skills ang kailangan sa constructionโ€ฆ

pero ang tunay palang puhunan: ๐™ข๐™š๐™ฃ๐™ฉ๐™–๐™ก ๐™ฉ๐™ค๐™ช๐™œ๐™๐™ฃ๐™š๐™จ๐™จ.โ€

When I first entered the construction industry, confident ako.

๐™ˆ๐™–๐™œ๐™–๐™ก๐™ž๐™ฃ๐™œ ๐™–๐™ ๐™ค ๐™จ๐™– ๐™™๐™ง๐™–๐™ฌ๐™ž๐™ฃ๐™œ๐™จ.
๐™ˆ๐™–๐™œ๐™–๐™ก๐™ž๐™ฃ๐™œ ๐™–๐™ ๐™ค ๐™จ๐™– ๐™จ๐™ž๐™ฉ๐™š.
๐™ˆ๐™–๐™ง๐™ช๐™ฃ๐™ค๐™ฃ๐™œ ๐™–๐™ ๐™ค ๐™ข๐™–๐™œ-๐™˜๐™ค๐™ข๐™ฅ๐™ช๐™ฉ๐™š.
๐™†๐™–๐™ฎ๐™– ๐™ ๐™ค โ€˜๐™ฉ๐™ค.

โ€™Yan ang akala ko.

Pero nung sumabak na sa totoong mundoโ€ฆ
dun ko nakita yung hindi tinuturo sa school,
hindi sinasabi ng mga โ€œbusiness gurus,โ€
at hindi nakikita sa TikTok success stories.

Construction business doesnโ€™t just test your skillsโ€”
๐—ถ๐˜ ๐˜๐—ฒ๐˜€๐˜๐˜€ ๐˜†๐—ผ๐˜‚๐—ฟ ๐—ฐ๐—ต๐—ฎ๐—ฟ๐—ฎ๐—ฐ๐˜๐—ฒ๐—ฟ.

Kala mo kailangan mo lang:
๐—ฐ๐—ฎ๐—ฝ๐—ถ๐˜๐—ฎ๐—นโ€ฆ ๐˜๐—ผ๐—ผ๐—น๐˜€โ€ฆ ๐—บ๐—ฎ๐—ป๐—ฝ๐—ผ๐˜„๐—ฒ๐—ฟโ€ฆ ๐˜€๐˜‚๐—ฝ๐—ฝ๐—น๐—ถ๐—ฒ๐—ฟ๐˜€.

Pero nung nagsimula ka na?

โ€ข Isang client lang na demandingโ€ฆ drained ka.
โ€ข Isang crew issue langโ€ฆ gusto mo nang mag-resign sa negosyo na sarili mo.
โ€ข Isang maling costing langโ€ฆ halos mawalan ka na ng tulog.
โ€ข Isang delayed delivery langโ€ฆ feeling mo end of the world na.

Hindi pala materials ang bumabagsak saโ€™yo.
๐—œ๐—ธ๐—ฎ๐˜„ ๐—ฝ๐—ฎ๐—น๐—ฎ.

Yung emotional frustration.
Yung doubt.
Yung pressure na walang tigil.
Yung kaba sa bawat desisyon.
Yung takot na baka ikaw ang sisihin.
Yung worry na baka malugi ka.

๐—ฌ๐—ฎ๐—ป ๐—ฝ๐—ฎ๐—น๐—ฎ ๐—ฎ๐—ป๐—ด ๐˜๐˜‚๐—ป๐—ฎ๐˜† ๐—ป๐—ฎ ๐—ธ๐—ฎ๐—น๐—ฎ๐—ฏ๐—ฎ๐—ป ๐˜€๐—ฎ ๐—ฐ๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฏ๐˜‚๐˜€๐—ถ๐—ป๐—ฒ๐˜€๐˜€.

Because letโ€™s be honestโ€ฆ

Hindi naman mahirap ang pagpapatayo ng bahay.
Hindi mahirap ang paggawa ng estimate.
Hindi mahirap ang pag-manage ng tao.

๐—”๐—ป๐—ด ๐—บ๐—ฎ๐—ต๐—ถ๐—ฟ๐—ฎ๐—ฝ?

โ€™Yung araw-araw na mental battle
kung kakayanin mo ba talaga.

Yung iba hindi bumabagsak dahil wala nang peraโ€”
bumabagsak dahil wala nang lakas ng loob.

Pero eto ang maganda:

Construction business rewards those who grow tougher.
Yung marunong mag-adjust.
Yung marunong magbasa ng kontrata.
Yung marunong umiwas sa sablay.
Yung marunong mag-handle ng pressure.
Yung marunong maging matatag kahit chaotic ang site.

The truth?

๐—–๐—ฎ๐—ฝ๐—ถ๐˜๐—ฎ๐—น ๐—ถ๐˜€ ๐—ฒ๐—ฎ๐˜€๐˜†.
๐—Ÿ๐—ผ๐—ฎ๐—ป๐˜€ ๐—ฎ๐—ฟ๐—ฒ ๐—ฒ๐—ฎ๐˜€๐˜†.
๐—ง๐—ผ๐—ผ๐—น๐˜€ ๐—ฎ๐—ฟ๐—ฒ ๐—ฒ๐—ฎ๐˜€๐˜†.
๐—•๐˜‚๐˜ ๐—ฟ๐—ฒ๐˜€๐—ถ๐—น๐—ถ๐—ฒ๐—ป๐—ฐ๐—ฒ?
๐——๐—ถ๐˜€๐—ฐ๐—ถ๐—ฝ๐—น๐—ถ๐—ป๐—ฒ?
๐—•๐˜‚๐˜€๐—ถ๐—ป๐—ฒ๐˜€๐˜€ ๐˜„๐—ถ๐˜€๐—ฑ๐—ผ๐—บ? โ€™

โ€ฆ๐—ฌ๐—ฎ๐—ป ๐—ฎ๐—ป๐—ด ๐—ธ๐˜‚๐—น๐—ฎ๐—ป๐—ด ๐—ป๐—ด ๐—ธ๐—ฎ๐—ฟ๐—ฎ๐—บ๐—ถ๐—ต๐—ฎ๐—ป. www.immaxconstruction.com

Done! Laban lng mga kapatid! Whillshire Project at Annapolis San Juan Metro Manila by Immax Engineering and Construction...
22/01/2026

Done! Laban lng mga kapatid! Whillshire Project at Annapolis San Juan Metro Manila by Immax Engineering and Construction. www.immaxconstruction.com

21/01/2026

๐Ÿ‡ต๐Ÿ‡ญ Philippines Construction Cost 2026: The Numbers Every Homebuyer Must Know

(Real Talk Update for Smart Homebuyers & Future Homeowners)

If youโ€™re planning to build or buy a house this 2026, donโ€™t guess the numbers. Construction costs in the Philippines have changed again โ€” and knowing the updated prices can save you from budget surprises, contractor issues, and delays.

Hereโ€™s the 2026 Real Talk Breakdown ๐Ÿ‘‡

โธป

๐Ÿ—๏ธ 1. 2026 Construction Cost Per Square Meter (National Average)

โ‚ฑ22,000 โ€“ โ‚ฑ38,000 per sqm
(depending on location, design, and finishes)

Low-cost finish: โ‚ฑ22,000โ€“โ‚ฑ28,000
Mid-range: โ‚ฑ28,000โ€“โ‚ฑ34,000
High-end: โ‚ฑ35,000โ€“โ‚ฑ50,000+

Metro Manila & Cebu = usually 20โ€“30% higher
Provincial cities like Butuan = more flexible pricing

โธป

๐Ÿ”ง 2. Main Factors That Affect Your Total Cost

These are the silent budget killers many buyers overlook:

โœ” 1. Lot Shape & Soil Condition

Bad soil = more foundation work = higher cost.

โœ” 2. Design Complexity

More glass, higher ceilings, and custom layouts = bigger expenses.

โœ” 3. Material Prices (still fluctuating)

Steel, cement, and tiles increased by 4โ€“9% this year.

โœ” 4. Labor Rates

Skilled labor is in demand; expect โ‚ฑ700โ€“โ‚ฑ900/day or more in cities.

โธป

๐Ÿ“ฆ 3. Sample Budget Guide (For Easy Visualization)

๐Ÿ  50 sqm house

โ‚ฑ1.1M โ€“ โ‚ฑ1.8M

๐Ÿ  70 sqm house

โ‚ฑ1.5M โ€“ โ‚ฑ2.4M

๐Ÿ  100 sqm house

โ‚ฑ2.2M โ€“ โ‚ฑ3.8M

Note: May increase pa if high-end finishes or complicated layout.

โธป

๐Ÿงฎ 4. Hidden Costs Many Homeowners Forget

Donโ€™t get blindsided by these:
โ€ข Building permits
โ€ข Architect/engineering fees
โ€ข Site clearing
โ€ข Utility connections
โ€ข Fence/gate
โ€ข Landscaping
โ€ข Contingency fund (always keep 10โ€“15%)

These small items combined can add โ‚ฑ150kโ€“โ‚ฑ500k to your total.

โธป

๐Ÿ’ก 5. Should You Build in 2026? (Expert Insights)

YES โ€” but be strategic.

Reason:
Construction prices rarely go down. Historically, materials go up 2โ€“9% yearly, so waiting another year could cost you hundreds of thousands more.

If you can start early, start small, expand later, or choose presellingโ€”you win in appreciation and lower entry cost.

โธป

๐Ÿงญ Bottom Line

Building a home is still worth it in 2026 โ€” as long as you know the numbers.
Plan smart. Budget wisely. And get guidance from someone who knows the real market

05/01/2026

๐— ๐—”๐—š๐—ž๐—”๐—ก๐—ข ๐—”๐—ก๐—š ๐—•๐—”๐—ฌ๐—”๐—— ๐—ฆ๐—” ๐—•๐—จ๐—œ๐—Ÿ๐——๐—œ๐—ก๐—š ๐—ฃ๐—˜๐—ฅ๐— ๐—œ๐—ง?
Isa ito sa pinaka-karaniwang tanong kapag magpapatayo ng bahay o gusali. Marami ang nagugulat dahil akala nila โ€œmaliit langโ€ ang building permit โ€” pero sa totoo lang, may basehan at proseso ito.

๐—”๐—ก๐—ข ๐—”๐—ก๐—š ๐—•๐—œ๐—ก๐—”๐—•๐—”๐—ฌ๐—”๐—ฅ๐—”๐—ก?
Ang building permit ay hindi lang isang papel. Ito ay binubuo ng ibaโ€™t ibang fees na dumadaan sa pagsusuri ng LGU.

๐— ๐—š๐—” ๐—ž๐—”๐—ฆ๐—”๐— ๐—” ๐—ฆ๐—” ๐—•๐—”๐—ฌ๐—”๐——:
โ€ข Building Permit Fee
โ€ข Electrical Permit
โ€ข Plumbing Permit
โ€ข Mechanical Permit (kung meron)
โ€ข Zoning Clearance
โ€ข Fire Safety Evaluation Fee
โ€ข Line and Grade Fee
โ€ข Contractorโ€™s Tax
โ€ข Documentary Stamp at iba pang regulatory fees

๐— ๐—”๐—š๐—ž๐—”๐—ก๐—ข ๐—œ๐—ง๐—ข ๐—ž๐—”๐——๐—”๐—Ÿ๐—”๐—ฆ๐—”๐—ก?
Sa pangkalahatan, ang building permit cost ay nasa โ€œhumigit-kumulangโ€:
โ€ข ๐Ÿญ% hanggang ๐Ÿฎ% ng estimated construction cost
(depende sa LGU, laki ng proyekto, at uri ng building)
Halimbawa:
Kung ang estimated cost ng bahay ay โ‚ฑ3,000,000
Maaaring nasa โ‚ฑ30,000 hanggang โ‚ฑ60,000 ang total permit fees

๐—•๐—”๐—ž๐—œ๐—ง ๐— ๐—”๐—›๐—”๐—Ÿ๐—”๐—š๐—” ๐—”๐—ก๐—š ๐—•๐—จ๐—œ๐—Ÿ๐——๐—œ๐—ก๐—š ๐—ฃ๐—˜๐—ฅ๐— ๐—œ๐—ง?
โ€ข Legal ang construction
โ€ข Nasusunod ang National Building Code
โ€ข Mas ligtas ang istruktura
โ€ข Iwas-demolition at penalties
โ€ข Kailangan sa future selling o loan ng property

๐—ฃ๐—”๐—”๐—Ÿ๐—”๐—Ÿ๐—”:
Magkakaiba ang singil bawat LGU. Laging i-check ang latest schedule of fees ng inyong city o municipality at siguraduhing kumpleto ang pirma ng mga licensed professionals.
Kung may balak kang magpatayo, mas mainam na i-budget na agad ang building permit para iwas delay sa construction.

24/12/2025

Immax Engineering and Construction Christmas party 2025

24/12/2025

Address

Marilao

Alerts

Be the first to know and let us send you an email when IMMAX Engineering and Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to IMMAX Engineering and Construction:

Share

Our Story

YOUR ONE-STOP HOUSE CONSTRUCTION COMPANY! Construction Design, Documentation and Estimate - Based on your proposed budget, we will develop a design concept that will suit your requirements. After the approval of the conceptual design, design detailing will follow which will include electrical, plumbing, structural and detailed architectural design. Bill of materials and detailed cost estimates will be prepared after the completion of detailed designs. Building Permit Application - We will apply building permit and will prepare all required engineering documents including sign and seal of respective professionals. We guarantee our strict adherence to the national building code and safety guidelines in the Philippines. Bank/Pagibig Loan Application - We will prepare all required technical documents for house construction bank loan or PAGIBIG loan. Construction Management and Supervision - We will supply all labor, materials, equipments, tools, transportation, supervisions and other items necessary for satisfactory completion of the work, including taxes required by the government. A Project Engineer will be assigned to supervise the construction site on a full time basis. We will constantly coordinate with you with regards to the progress of works and any concerns that may arise during the construction period. Water and Electricity Connection - We will process your application for permanent connection of water and electricity in the Philippines. Warranty - We will repair at our own cost any defects, leakages or other faults which shall appear due to poor materials and workmanship within twelve (12) months from the date of completion and 15 years for the structural.