ποΈ AS-BUILT PLAN vs PROPOSED PLANπ
Ano ang difference nila sa Building Permit Application?
π AS-BUILT PLAN
Ito ang actual existing or finished structure based sa current condition ng building.
β
Pros:
β’ Mas mabilis ang drafting since existing na ang structure.
β’ Reflects the actual dimensions, revisions, at installations sa site.
β’ Useful for legalization and verification of existing buildings.
β Cons:
β’ Possible Notice of Deficiency kapag may non-compliance sa Building Code, Fire Code, at Zoning.
β’ May penalties dahil nauna ang construction bago permit.
β’ Limited na minsan ang revisions dahil existing na ang structure.
π PROPOSED PLAN
Ito naman ang planned design before construction starts.
β
Pros:
β’ Mas napaplano nang maayos ang design, layout, at systems before construction.
β’ Mas organized at tuloy-tuloy ang construction process.
β’ Walang penalties from OBO, BFP, at Zoning kapag permit muna bago build.
β’ Easier revisions habang nasa planning stage pa.
β Cons:
β’ Mas matagal ang preparation due to planning and revisions.
β’ Possible changes pa during construction depende sa budget at site conditions.
π Bottom Line:
AS-BUILT focuses on documenting kung ano na talaga ang existing or naitayo sa site, while PROPOSED focuses on proper planning and compliance bago magsimula ang construction.
For smoother permit processing and less complications during construction, mas recommended pa rin ang βPlan First Before Build.β πβ
Call us now and letβs build your next project with confidence.