Cheetsters Engineering

Cheetsters Engineering - Fabrication
- Maintenance
- Trailers
- Race cars
- General Engineering
- Gates
- CNC cutting

New digger mount we made to suit fixing a 3 point linkage post rammer to a 5 tone Kabota digger.
02/06/2026

New digger mount we made to suit fixing a 3 point linkage post rammer to a 5 tone Kabota digger.

Remove old bumpers and tac new supplied bumpers back on
01/06/2026

Remove old bumpers and tac new supplied bumpers back on

Another cool classic stockcar in for a good tidy up. - Motor forward chop - Set of custom rims - Couple steering arms
31/05/2026

Another cool classic stockcar in for a good tidy up.

- Motor forward chop
- Set of custom rims
- Couple steering arms

Classic Stockcar came in for a freshen up. - new side rails - new wheel gates - new front bumper - new over and under ri...
21/05/2026

Classic Stockcar came in for a freshen up.

- new side rails
- new wheel gates
- new front bumper
- new over and under riders on front
- plate rear bumper
- 2 new steering arms

Trailer WOF repairs. Trailer came in with a massive list of WOF repairs to be completed to get it back to work. - New Ro...
15/05/2026

Trailer WOF repairs.
Trailer came in with a massive list of WOF repairs to be completed to get it back to work.

- New Rockers
- New Spring Hangers
- New 2500kg Coupler
- Replace bent / Broken U Bolts
- Replace brake pads
- New Spring bushes & Bolts
- Replace Grip Ply Decking

Another truck job complete. Customer wanted to reuse the old truck deck and subframe and retro fit to the new one, also ...
13/05/2026

Another truck job complete.

Customer wanted to reuse the old truck deck and subframe and retro fit to the new one, also supplied and fitted…
- New 24v hydraulic pump
- 2x toolbox’s with polished doors
- New rear tail lights
Also had to…
- remove ramp / rolled off the rear of deck
- Respray sides of deck and subframe

Had this trailer come in for a new one piece grip ply deck to be supplied and fitted.
12/05/2026

Had this trailer come in for a new one piece grip ply deck to be supplied and fitted.

First car in for off season rebuild complete- New Side rails- New Front bumper - New Rear Bumper
11/05/2026

First car in for off season rebuild complete

- New Side rails
- New Front bumper
- New Rear Bumper

CRC  #8 / 208A This car was built and sent out the door rolling. - HSP 9” Diff - 2x HT Front beams - HSP Front stubs - C...
24/04/2026

CRC #8 / 208A

This car was built and sent out the door rolling.
- HSP 9” Diff
- 2x HT Front beams
- HSP Front stubs
- Chromolly crosses and out riggers
- High Tensile Bumpers / Side Rails
- Alloy pedal box, firewall, dash and battery box
- Set of alloy arms
- Set of GM brake callipers
- Stainless Fuel tank

Had a Stainless steel engine cover come in needing to be fully rewelded.
23/04/2026

Had a Stainless steel engine cover come in needing to be fully rewelded.

Address

Te Puke
Te Puke

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Cheetsters Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Cheetsters Engineering:

Share