FakaD Engineering Company Ltd.

FakaD Engineering Company Ltd. Plot 351, Cadastral zone B03 wuye Abuja

Highway Construction. Base Course FDT.
24/08/2026

Highway Construction.
Base Course FDT.

24/08/2026
Highway Construction. Median kerbs....
21/08/2026

Highway Construction.
Median kerbs....

Highway Construction. Base Course
20/08/2026

Highway Construction.
Base Course

Highway Construction
19/08/2026

Highway Construction

Highway Construction
18/08/2026

Highway Construction

πŸ—οΈ Building Episode Construction Pre-Pour Inspection & Slab CastingBefore concrete is poured, the reinforcement and form...
17/08/2026

πŸ—οΈ Building Episode Construction
Pre-Pour Inspection & Slab Casting

Before concrete is poured, the reinforcement and formwork should undergo a final inspection to confirm that the work conforms to the structural drawings.

Then comes casting of the first-floor suspended slab.

Key checks before casting include:

Reinforcement diameter and spacing

Concrete cover and spacers

Beam reinforcement and anchorage

Formwork level, dimensions and stability

Proper propping and bracing

Service conduits/openings

Cleanliness of the formwork

After approval, the Grade 25 concrete can be placed, properly vibrated, levelled and finished, followed by adequate curing.

🏑 MODERN 4-BEDROOM HOMEA beautifully designed 3-bedroom contemporary home combining elegance, comfort and functionality....
13/08/2026

🏑 MODERN 4-BEDROOM HOME

A beautifully designed 3-bedroom contemporary home combining elegance, comfort and functionality.

✨ Modern architectural façade
πŸ›οΈ Spacious 3-bedroom layout
πŸš— Ample parking space
🌿 Landscaped compound
🧱 Modern perimeter fence
πŸ”² Stylish interlocking paving
πŸ’‘ Attractive exterior lighting

A perfect blend of modern design, security and comfort for contemporary living.

FAKAD ENGINEERING COMPANY LTD
Design β€’ Construction β€’ Supervision β€’ Quality Assurance

πŸ—οΈ NEXT BUILDING EPISODE β€” SUSPENDED SLAB REINFORCEMENT FIXING 🚧After completing the formwork for the first-floor suspen...
12/08/2026

πŸ—οΈ NEXT BUILDING EPISODE β€” SUSPENDED SLAB REINFORCEMENT FIXING 🚧

After completing the formwork for the first-floor suspended slab, the next stage is the fixing of reinforcement according to the structural drawings.

The reinforcement provides the required tensile strength and helps the slab safely carry the imposed loads.

At this stage, proper attention is given to:

βœ… Correct bar diameter and spacing
βœ… Beam and slab reinforcement arrangement
βœ… Proper lap lengths and anchorage
βœ… Adequate concrete cover
βœ… Correct positioning of top and bottom reinforcement
βœ… Proper installation of spacers and reinforcement chairs

Before concrete casting, the entire reinforcement arrangement must be carefully inspected and approved to ensure it conforms to the structural design.

Every bar matters. Every detail counts. Quality starts before the concrete is poured. πŸ‘·πŸ½β€β™‚οΈπŸ—οΈ

Follow FakaD Engineering Company Ltd for more real construction activities and building episodes.

Address

Plot 351, WUYE Abuja
Abuja

Telephone

+2349011578252

Website

Alerts

Be the first to know and let us send you an email when FakaD Engineering Company Ltd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to FakaD Engineering Company Ltd.:

Shortcuts

Share