ALDAR International Co

ALDAR International Co Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from ALDAR International Co, 306 Street # 18 , Building # 36 Al Baradya, Basra.

18/12/2017
21/10/2015

تعلن شركة الدار الدولية عن حاجتها للاختصاصات التالية

Marian Operator
Material Controller
Material Engineer

للعمل في مواقع الشركة على من لدية الخبرة على ان لاتقل عن 3 سنوات في اختصاص المواد في مجال النفط ارسال السيرة الذاتية على الايميل التالي

[email protected]
[email protected]

مع الشكر والتقدير

Electrical works for Slug CatcherClient : Shell/CCCNorth Rumaila /Basra
08/09/2015

Electrical works for Slug Catcher
Client : Shell/CCC
North Rumaila /Basra

07/09/2015
Badra oil project
06/09/2015

Badra oil project

ISO Certificates
06/09/2015

ISO Certificates

.AlDar International CoClients
06/09/2015

.AlDar International Co

Clients

Operation and Maintenance Contracts for Badra OilfieldProvisions of competent, experienced and a professional manpower a...
06/09/2015

Operation and Maintenance Contracts for Badra Oilfield

Provisions of competent, experienced and a professional manpower and equipment/vehicle as further described in this scope of service to support:
• Pre commissioning
• Commissioning
• Maintenance
• Shutdown activities

Location : Badra Oilfield—Waset—Iraq

Client : Petrofac International (UAE) LLC .

Daate : 2015.

Air Blowing and Chemical Cleaning -FCP Gas Train 1 & Train 2Scope of WorkThe below described scope of work is for Train ...
06/09/2015

Air Blowing and Chemical Cleaning -FCP Gas Train 1 & Train 2

Scope of Work
The below described scope of work is for Train 1 only. Train 2 scope of work currently is
not fully clear. Once SOLAR packages arrive from Houston and cleanliness inspections
have been completed, Work-packs shall be generated by COMPANY and will be
submitted to Subcontractor for executions using the same unit rates as defined for Train

1.1. Air Blowing
A Boroscope exercise was carried out on skids delivered from Houston, Process skids
and pipe rack modules. The findings, minor debris and scaling, deem it necessary to
Perform air blowing as per the following Work Packs.
Work Pack no. 1 – Instrument Air
Work Pack no. 2 – 1st Stage Filter Sep
Work Pack no. 3 – 1st Stage Discharge Coolers
Work Pack no. 4 – 2nd Stage Compression

Work Pack no. 5 – 2nd Stage Discharge Cooler
Work Pack no. 6 – Station Recycle
Work Pack no. 7 – FG/SG Pipework
Work Pack no. 8 – FG/SG Skid
Work Pack no. 9 – FGC Skid
Work Pack no. 10 – Turbine Utility Skid

Air Blowing will be carried out as per the referred procedure ’FCP Gas Train 1
Cleanliness’ (Doc. no. GAS1-GP1-SIP-MP-6025-0001). Subcontractor shall supply all
manpower, consumables, tools, plant and equipment to execute air blowing works.

1.2. Chemical Cleaning
In addition to the air blowing it has been decided that chemical cleaning should be carried
out on the following systems as per the referred marked-up P&IDs

System : Material
Fuel Gas : Stainless Steel & Carbon Steel
Seal Gas : Stainless Steel
N2 : Stainless Steel



Client : Shell

Date: 2015

Mechanical Cleaning for static equipment at KAZ plantThe SOW for this project is contained but not limited to complete t...
05/09/2015

Mechanical Cleaning for static equipment at KAZ plant

The SOW for this project is contained but not limited to complete this tasks:

Dismantling of existing Piping, equipment, Exchangers, heaters….for mechanical cleaning and re-installation work, the work includes Mechanical works, purging, hydro testing, and fabrication for some items.

Client :Technip- BGC

Location : Basra- Iraq

Modular Building Installation-DS7 ISBL Water Injection SystemModular Building Installation- Iraq- Basra- west Qurna 1 (M...
05/09/2015

Modular Building Installation-DS7 ISBL Water Injection System

Modular Building Installation- Iraq- Basra- west Qurna 1 (M095) DS7 ISBL Water Injection System

Scope Of work:

Installation of prefabricated steel structural building for LCR ,The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system

Client : Saipem

Location : Iraq/Basra/ West Qurna 1

date : Sept 2015

Address

306 Street # 18 , Building # 36 Al Baradya
Basra

Alerts

Be the first to know and let us send you an email when ALDAR International Co posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ALDAR International Co:

Share