HME Services LTD

HME Services LTD Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from HME Services LTD, Engineering service, Woodside Lane, Sheffield.

Pair of submersible waste water pumps we had in recently for reconditioning. Stripped, cleaned, shotblasted, new seals a...
12/06/2025

Pair of submersible waste water pumps we had in recently for reconditioning.

Stripped, cleaned, shotblasted, new seals and bearings, rebuilt and painted!

——————————————————————————
📞 07447 654 213
📞 07561 056 780
📧[email protected]
📧[email protected]
📍Woodside Lane, Sheffield, S3 9PB
——————————————————————————

Couple of jobs in today for usKrupp 35GMT-AT not filling the air receiversVolvo 240 Skip Loader will not start and has a...
12/06/2025

Couple of jobs in today for us

Krupp 35GMT-AT not filling the air receivers

Volvo 240 Skip Loader will not start and has a faulty shifter mechanism

Nissan 2.5T Forklift with a gas leak

——————————————————————————
📞 07447 654 213
📞 07561 056 780
📧[email protected]
📧[email protected]
📍Woodside Lane, Sheffield, S3 9PB
——————————————————————————

Our team was called out to this automated 25mm x 2.5M steel plate guillotine breakdown.The hydraulics tripped out on aut...
16/01/2025

Our team was called out to this automated 25mm x 2.5M steel plate guillotine breakdown.

The hydraulics tripped out on auto setting due to collapsed guide rollers and bearings.

This has allowed the machine to run with side loading causing the linear gears and drive gears to shatter.

Once the issues had been diagnosed we got work by using box sections to support the load of the shear and clamp housing fabrications.

Then disconnecting the necessary sensors and Hydraulic lines we could remove the Hydraulic ram base plates from the clamping plate.

Further to this both shear Hydraulic rams and both clamping rams had to be removed.

We used the method of driving the plate bed rollers to send the shear/clamping fabrication out of its guiding frame.

Then refurbishment of the unit began, in total 32x new bearings. 4x new guide rollers. 2x guide rollers shafts. 1 drive gear. 1 drive gear key. 1 linear gear got exchanged.

4x rams we pressure tested. Resulting in 1 fail. 3 pass. However 1 rod repair needed carrying out and 2 rod threads needed repair.

The customer had an exchange cylinder in stock and so this meant we could action the rebuild, all new fasteners used throughout, fresh Lubrication and careful alignment techniques.

After 4 days the entire machine was back together and tested. Meaning the customer could go back to full production.

If you need site engineering works get in touch for fast, effective, multiskilled solutions.

Address

Woodside Lane
Sheffield
S39PB

Opening Hours

Monday 8:30am - 5pm
Tuesday 8:30am - 5pm
Wednesday 8:30am - 5pm
Thursday 8:30am - 5pm
Friday 8:30am - 5pm
Saturday 9am - 12pm

Alerts

Be the first to know and let us send you an email when HME Services LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share