Phase 1 garages on a new site — we’re fitting Prefa metal fascia, soffits and barge boards, with all fabrication completed by our team on site.
The big win is speed and flexibility. On this package, the main contractor is seeing an estimated ~30% saving versus fully manufactured routes, by avoiding design/manufacturing bottlenecks and working directly to site conditions.
Prefa coils can be on site within a couple of days, and if a detail changes, we can adjust and fabricate immediately — helping to avoid long lead-ins (often around 6 weeks, scope dependent).