Jigsaw Fabrication

Jigsaw Fabrication Jigsaw Fabrication specializes in ventilation systems, and the fabrication of stainless steel. Insurance work undertaken. Part of The Jigsaw Construction Group.

New Chillos opened in Bridgeton. Table was made to customers specifications. Centre table with Gantry on top. Gantry had...
06/03/2026

New Chillos opened in Bridgeton. Table was made to customers specifications. Centre table with Gantry on top. Gantry had slopped shelf’s with heated lamps installed to keep food hot.

Any customer looking to get work done message the page for a free quote.

A collection of some of our more recents Canopy’s. 1st Canopy has been notched out on the back right corner to fit tight...
06/03/2026

A collection of some of our more recents Canopy’s.

1st Canopy has been notched out on the back right corner to fit tightly into customers wall. Canopy was made to suit 500mm filters on the left - 450mm filters on the right hand side.

2nd Canopy is tapering on the right hand side towards back wall. Length of the front of the canopy is 2950mm going to 2800mm at the back.

3rd Canopy is made from galvanised sheets. A cheaper alternative which is riveted together. Canopy will be over claded with menu boards etc.

Anyone looking to get work done, message the page for a free quote.

Another custom Canopy completed. 3.8 metres long with a cut out through full depth of the Canopy for a beam passing thro...
06/03/2026

Another custom Canopy completed. 3.8 metres long with a cut out through full depth of the Canopy for a beam passing through.

8 metre fully welded canopy. Fortunately canopy could be fully fabricated and taken in 1 peice to the customers shop as ...
12/04/2025

8 metre fully welded canopy. Fortunately canopy could be fully fabricated and taken in 1 peice to the customers shop as we had enough access to manoeuvre it into place.

Kurdistan Bread and Breakfast in Glasgow, awning fitted on site. Bar and brackets fabricated in workshop to suit awning ...
12/04/2025

Kurdistan Bread and Breakfast in Glasgow, awning fitted on site. Bar and brackets fabricated in workshop to suit awning the customer bought.

A collection of some of our recents jobs. Different sizes and styles of canopy’s, sinks, heated gantries, shelves, table...
12/04/2025

A collection of some of our recents jobs. Different sizes and styles of canopy’s, sinks, heated gantries, shelves, tables and counter tables. All jobs completed to customers specifications. Any customers looking for a quote to get work done in their shop, message this page and we will get back to you as soon as possible with a quote.

Sinks and counter table ready for contractor to install in customers shop. Everything made to sizes contractor had reque...
05/09/2024

Sinks and counter table ready for contractor to install in customers shop. Everything made to sizes contractor had requested.

We Hae Meat Factory in Girvan. 2 stainless steel canopy’s installed along with full extraction ductwork. Spiral duct pas...
05/09/2024

We Hae Meat Factory in Girvan. 2 stainless steel canopy’s installed along with full extraction ductwork. Spiral duct passes through the warehouse to the outside wall where fan is installed which then runs up the wall and finished off with a vertical jet cowl. Hatches are fitted through the pipes for easy cleaning.

One of our many clients, the major franchise Chaiiwalla. All of the Scottish stores fabrication work has been undertook ...
18/08/2024

One of our many clients, the major franchise Chaiiwalla. All of the Scottish stores fabrication work has been undertook by ourselves. We look forward to many more projects together.

Tandoori Mahal in wishaw. Extensive fire damage to ventilation system. Site survey done at 10pm and new system was up an...
14/08/2024

Tandoori Mahal in wishaw. Extensive fire damage to ventilation system. Site survey done at 10pm and new system was up and running within 2 days. Customer was delighted with the quick service as he did not endure too much disruption to the business.

Lamego’s in wishaw. Ventilation system upgraded as previous system that was initially installed by another contractor wa...
11/08/2024

Lamego’s in wishaw. Ventilation system upgraded as previous system that was initially installed by another contractor was not performing as it should. New ductwork was installed along with a new extraction fan and replacing the outdated China hat with a vertical jet cowal.

Address

Paisley

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Jigsaw Fabrication posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share