25/08/2026
August Newsletter - Issue 44
It’s safe to say that August saw a strong focus on our asset steel range, including:
1️⃣ asset MultiPlate Conveyor Tunnel (Case Study) -
This asset MultiPlate MP200 stockpile conveyor tunnel (with escape tunnel and bulk head) is located at Wickwar Quarry, Asphalt & Concrete Plant, in Gloucestershire.
Full case study ➡️ https://www.assetint.co.uk/post/asset-multiplate-wickwar-quarry
2️⃣ asset MultiPlate Underbridge Extension (Structure Spotlight) -
The chosen solution for this rail underbridge extension project at Mount Pleasant had a 6.25m span, 3.16m rise, and a 10.5m length arch, along with a 9.75m length arch.
3️⃣ asset BaFix (asset Insight) -
We are interested to hear where you think asset BaFix can add the most value. Whether that’s in challenging ground conditions, areas with limited maintenance access, or locations where ballast retention is a recurring issue. Let us know in the comments below!👇