Topframe Engineering Ltd.

Call Website

Topframe Engineering Ltd. Specialist provider of structural and general engineering, and machine design and fabrication.

16/10/2026

Engineering in action!

Here's a look at one of our recent engineering projects at Topframe Engineering, manufacturing sluice gates (also known as stop logs) for the River Lagan, in collaboration with

Key specs:

📏 Length: 19 meters long
⚖️ Weight: ~6 tons each
🎨 Finish: Marine-spec coating built for harsh water environments

These heavy-duty steel logs are designed to be stacked on top of one another to control river flow, ensuring downstream maintenance on the River Lagan banks can be carried out safely and effectively.

Great to see specialized heavy engineering projects coming through our factory! 🏗️

🔗 Learn more about our capabilities at www.topframe.co.uk
📧 [email protected] | 📞 028 79 469959

🏗️ Topframe Engineering @ Marketplace Live, BristolAs a Constructionline member, the Topframe Engineering team will be a...
13/10/2026

🏗️ Topframe Engineering @ Marketplace Live, Bristol

As a Constructionline member, the Topframe Engineering team will be at Ashton Gate Stadium tomorrow, Wednesday 14th October, for the Marketplace Live networking event in Bristol.

We’re looking forward to discussing our recent structural steel projects, sharing our expertise in steel fabrication, and exploring new collaboration opportunities across the South West and the wider UK construction market.

If you’re attending the event, make sure to drop by and chat with the team. See you there! 👋🏻

Partnering once again with Duncan Plant in Ballycastle, we’re dispatching these custom wind turbine hub stands to suppor...
12/10/2026

Partnering once again with Duncan Plant in Ballycastle, we’re dispatching these custom wind turbine hub stands to support ground-level turbine blade assembly. These are just one of the many custom fabrication projects we build here at Topframe Engineering.

We are proud to highlight the successful dispatch of the final structural steel phase for Masons Animal Feeds, manufactu...
06/10/2026

We are proud to highlight the successful dispatch of the final structural steel phase for Masons Animal Feeds, manufactured for Lappin Engineering and safely on its way to its final destination in Craigavon.

From initial design to heavy fabrication and final site delivery, our team at Topframe Engineering remains committed to building the robust infrastructure that keeps modern industry moving forward.

🚨 NOW HIRING: SAW LINE OPERATOR 🚨We’re Hiring! Topframe Engineering is growing, and we are currently looking for a skill...
01/10/2026

🚨 NOW HIRING: SAW LINE OPERATOR 🚨

We’re Hiring! Topframe Engineering is growing, and we are currently looking for a skilled Saw Line Operator to join our team at our brand-new, state-of-the-art facility in Castledawson.

✨ Bonus scheme / grip work
✨ Evening & weekend hours available
✨ Time & a half overtime rates

Apply now!
📞 028 79 46 9959
📧 [email protected]

29/09/2026

Topframe Engineering has taken a major step towards a more sustainable future. We've installed a 300kWp solar PV system at our Castledawson site, made up of 466 solar panels, paired with 522.4kWh of battery storage. Together, they replace our reliance on 300kVA and 100kVA generators.

The system is projected to offset 66% of our on-site electricity demand from the grid. That’s an estimated 50 tonnes of CO₂ saved in the first year alone, and more than 1,184 tonnes over the next 25 years.

It reduces our reliance on generators, the grid, and fossil fuels, and supports our commitment to environmental responsibility under our ISO 14001 certification, while giving us greater control over our own energy usage and reducing exposure to volatile fuel and electricity prices.

TRE Energy UK & Ireland

Project Milestone - 25 tonnes of steel on the move! 🚛 Headed to the DNA Museum in Derry for the final phase of the build...
25/09/2026

Project Milestone - 25 tonnes of steel on the move! 🚛 Headed to the DNA Museum in Derry for the final phase of the build. Let’s get it done.

From intern to permanent team member! 👏🏻 After completing his 12-week internship with Topframe Engineering and Biddy Att...
18/09/2026

From intern to permanent team member! 👏🏻

After completing his 12-week internship with Topframe Engineering and Biddy Attachments, we’re delighted that Nirvan has accepted a full-time permanent position as our Digital Marketing & Social Media Executive. 💫

🎓 Nirvan joined us through the Queen’s University Belfast Business School MSc Marketing Internship Programme, bringing with him an MBA and more than six years of previous professional experience.

From the outset, it was clear that this experience, combined with his postgraduate studies at Queen’s, would bring a fresh perspective to our marketing across both Topframe Engineering and Biddy Attachments.

Nirvan quickly got to work on his internship, developing structured 12-week marketing strategies for both businesses, identifying opportunities to strengthen our digital presence, increase brand awareness and better showcase the capabilities, projects and people behind our companies. 📈

We would also like to recognise Queen’s Business School and the value of its internship programme. It has provided us with the opportunity to bring an experienced postgraduate into the business, see first-hand what he could contribute and, ultimately, create a permanent position within our team.. win win for everyone involved!

This photo might show Nirvan accepting a small token of our appreciation for his contribution over the past 12 weeks, but we have much bigger goals on the horizon and look forward to striving towards them together!

Congratulations Nirvan, and officially, welcome to the team!
Hope you are enjoying your well deserved holiday!

🎂 Another round of Topframe birthdays! A big Happy Birthday to some of the Topframe team celebrating throughout August a...
11/09/2026

🎂 Another round of Topframe birthdays!

A big Happy Birthday to some of the Topframe team celebrating throughout August and September - Shane, Chris, Dylan McD, Arnie and James!

Hope you all had a great one! 🥳

🏗️ Topframe Engineering @ Marketplace Live, North LondonAs a Constructionline member, Topframe Engineering will be atten...
08/09/2026

🏗️ Topframe Engineering @ Marketplace Live, North London

As a Constructionline member, Topframe Engineering will be attending the Marketplace Live networking event in North London tomorrow, 9th September.

We’ll be showcasing some of our recent and current structural steel projects across the UK, as we continue to grow our presence and develop new opportunities within the UK construction market.

We’re looking forward to connecting with fellow contractors, buyers and industry colleagues .. if you’re attending, come and say hello! 👋🏻

ConstructionUK SteelFabrication

Address

72 Glenshane Road Castledawson
Castledawson
BT458DQ

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 1pm

Telephone

+442879469959

Alerts

Be the first to know and let us send you an email when Topframe Engineering Ltd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share