Leecheng Steam Turbine Solutions

Website

Leecheng Steam Turbine Solutions Steam turbine maker & service provider. Strategic partner of China Changjiang Power Group.

Custom turnkey power solutions for industrial self-generation, waste-to-energy & waste heat recovery with full construction support.

Shandong Licheng Industrial Equipment Co., Ltd. wishes all Chinese people around the world a Happy Mid-Autumn Festival! ...
24/09/2026

Shandong Licheng Industrial Equipment Co., Ltd. wishes all Chinese people around the world a Happy Mid-Autumn Festival! 🌕🥮

May the full moon bring reunion, happiness, good health, and prosperity to you and your family.

Happy Mid-Autumn Festival! 🏮

23/09/2026

30MW Waste-to-Energy Plant – Waste Storage Pit
Take a look inside the waste storage pit of a 30MW Waste-to-Energy power plant.
We provide complete Waste-to-Energy solutions and EPC turnkey services. Steam turbines and turbine generator sets can also be supplied separately according to your project requirements.
From waste to electricity, we provide professional Waste-to-Energy solutions for your project.
Contact us and let’s work together to create a greener energy future!

A brand-new 50MW Waste-to-Energy Power Plant has been successfully completed!Let’s take a look inside the project’s cent...
22/09/2026

A brand-new 50MW Waste-to-Energy Power Plant has been successfully completed!
Let’s take a look inside the project’s central control room and steam turbine generator hall.
From the modern centralized control system to the clean and well-organized steam turbine generator unit, every detail reflects the professionalism and engineering quality of a large-scale power generation project.
Waste is not just something to be disposed of — it can also be transformed into clean and reliable electricity.
The 50MW Waste-to-Energy project is ready!
What do you think of the steam turbine generator hall?
Does it look impressive?
Contact us and let’s work together to create a greener energy future!
Phone:+86 133 7157 8878

3MW Waste-to-Energy SolutionHow can 200 tons of municipal solid waste per day be converted into electricity?LEECHENG pro...
10/09/2026

3MW Waste-to-Energy Solution

How can 200 tons of municipal solid waste per day be converted into electricity?

LEECHENG provides integrated small and medium-scale Waste-to-Energy solutions, converting municipal solid waste into useful energy through mechanical grate incineration, waste heat recovery boilers, steam turbine generator sets, and advanced flue gas treatment systems.

♻️ Reference Waste Treatment Capacity: 200 tons/day
⚡ Installed Power Capacity: 3MW
🔥 Mechanical Grate Incineration + Waste Heat Recovery Boiler
⚙️ Condensing Steam Turbine Generator Set
🌿 Complete Flue Gas Treatment & Environmental Protection System
🏭 Suitable for small and medium-sized cities and regional waste treatment projects

Turning waste from a disposal challenge into a valuable energy resource.

LEECHENG
Shandong Licheng Industrial Equipment Co., Ltd.
Small & Medium Waste-to-Energy Solutions

Phone:+86 133 7157 8878

Precision Components for Reliable Steam Turbine Performance High-quality Steam Turbine Diaphragms & Turbine Parts, engin...
10/09/2026

Precision Components for Reliable Steam Turbine Performance
High-quality Steam Turbine Diaphragms & Turbine Parts, engineered for stable, efficient and reliable operation.
✓ High Precision Manufacturing
✓ Durable Materials
✓ Reliable Performance
✓ Customized Solutions
✓ Turbine Parts & Replacement Services
Shandong Licheng Industrial Equipment Co., Ltd.
Professional Steam Turbine & Power Generation Solutions Provider
📩 Contact us for technical inquiries, replacement parts and project solutions.
Phone:+86 133 7157 8878



28/08/2026

Stator end‑wiring and insulation binding process for large turbo‑generators. Strictly control the quality of winding welding and insulation wrapping to avoid end‑part vibration‑wear risks and ensure long‑term stable and reliable operation of turbo‑generator units.

Steam Turbine & Generator|Self‑developed Rotors, Complete‑set Equipment One‑stop SupplyRotors are the heart of steam tur...
26/08/2026

Steam Turbine & Generator|Self‑developed Rotors, Complete‑set Equipment One‑stop Supply
Rotors are the heart of steam turbines and generators.
We take full control of the whole process, from rotor structural design, precision forging & machining to dynamic balance calibration.

✅ Steam Turbine Rotor: Strict dynamic balance treatment, high temperature & pressure resistance, stable performance under steam working conditions.
✅ Generator Rotor: High‑precision winding assembly, low power loss, stable power output for various power generation projects.

We specialize in the design, manufacturing and sales of complete steam turbines and generators. We supply standalone units as well as full‑set power generation solutions for global projects with customized parameter selection available.

Message us for technical specifications and quotations 📩
Phone:+86 133 7157 8878

24/08/2026

高速动平衡超速试验真空舱
Vacuum spin‑test chamber:For high‑speed rotor balancing and overspeed burst test.
Reason for vacuum (negative‑pressure) operation:
A bladed rotor spinning at high speed suffers huge air‑drag power loss and excessive heat under atmospheric pressure. Vacuum removes air drag so the rotor can achieve rated / overspeed speed. The robust chamber also delivers explosion protection should the rotor burst.

Key functions:
① High‑speed rotor balancing
② Overspeed test (115%‑120% rated speed) for rotor strength verification. The chamber withstands fragment impacts upon rotor rupture.
Phone:+86 133 7157 8878
Email: [email protected]

Real shot of standardized steam turbine production workshop, precision manufacturing throughout all processes. Our profe...
04/08/2026

Real shot of standardized steam turbine production workshop, precision manufacturing throughout all processes. Our professional team provides one-stop services including on-site equipment installation, complete unit commissioning and after-sales maintenance. Every production procedure is strictly controlled to ensure long-term stable operation of units. Feel free to message us for quotations if needed!

29/07/2026

Dynamic balancing calibration for N2-0.5 saturated steam turbine rotor
A turbine’s reliability depends on rotor balance.
We perform professional rotor dynamic balancing to cut vibration to a minimum.
Less equipment wear, lower breakdown risks, ensuring stable long-term turbine operation.




Address

中国
Zibo
255000

Alerts

Be the first to know and let us send you an email when Leecheng Steam Turbine Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share