ZHIHE Electric

Website

ZHIHE Electric China Transformer Radiator | China Transformer Oil Tank | China E-house enclosure

29/09/2026

What does an order of 1,000+ single-phase cylindrical transformer tanks look like? 👀

Robotic welding, airtight leak testing and automated coating—all moving steadily through the ZHIHE production line.

Built at scale. Controlled at every step.

23/09/2026

What makes a reliable power transformer oil tank?

Clean, consistent welds.
Strict leak testing.
Thorough sandblasting.
A smooth, durable paint finish.

From automated welding to final coating, every process is carefully controlled.

Custom-built by ZHIHE, based on your drawings.

What does a transformer radiator actually do?When an oil-immersed transformer is operating, losses from the windings and...
14/09/2026

What does a transformer radiator actually do?

When an oil-immersed transformer is operating, losses from the windings and core generate heat. The transformer oil absorbs this heat and carries it away from the active part.

Hot oil rises and enters the transformer radiator through the upper connection. It then flows through the radiator elements, where heat is transferred through the steel surfaces to the surrounding air. As the oil cools, it returns to the lower part of the transformer tank.

This circulation helps:

• Control top-oil and winding temperature rise
• Protect transformer oil and cellulose insulation
• Support stable transformer operation
• Extend the service life of temperature-sensitive components

In an ONAN cooling system, both oil and air circulate naturally. In an ONAF system, fans increase airflow across the radiator surfaces to improve heat dissipation.

A power transformer radiator may look simple, but its performance depends on accurate engineering and manufacturing. Radiator dimensions, heat-transfer area, panel spacing, fl**ge centre distance, weld integrity and internal cleanliness all matter.

At Nantong Zhihe Electric, transformer radiators are manufactured according to approved customer drawings. Our capabilities include:

• 7 automatic radiator welding lines
• 100% leakage testing
• Dimensional and fl**ge inspection
• C3–C5 coating systems
• Hot-dip galvanized radiator options
• OEM and ODM production

Need custom transformer radiators for a new transformer project or replacement requirement? Send us your drawing, quantity, coating specification and required delivery date for review.

05/09/2026

🔥 224 Pad-Mounted Transformer Enclosures in Full Production!

From steel fabrication and robotic welding to surface coating, every stage is carefully controlled. Continuous, full weld seams, smooth paintwork without runs or sagging, and accurate component assembly help ensure consistent and reliable quality.

Rows of finished enclosures are now being prepared for delivery to the U.S. market. 🇺🇸

These 224 units represent more than a large order—they demonstrate our capacity for volume production, strict quality control and dependable delivery.

Looking for a reliable supplier of custom pad-mounted transformer enclosures or other transformer sheet-metal components? Feel free to contact us.

03/09/2026

Large volumes. Consistent quality. Reliable delivery. ⚙️

Rows of transformer radiators, ready for shipment. 🚛
Clean welds. Uniform seams. Solid construction. 🔍
Every detail reflects our commitment to quality.

From batch production to final loading,
each radiator is manufactured according to customer drawings and technical requirements. 📐

Built with precision.
Tested for reliability.
Delivered on schedule. ✅

Looking for a reliable transformer radiator manufacturer?
Send us your drawings or technical specifications. 📩

31/08/2026

98 Main Transformer Oil Tanks. One Major Order. 💪

Our workshop is running at full capacity as we move forward with an order of **98 main transformer oil tanks**.

From skilled welding and detailed weld inspection to sandblasting, coating and final preparation for shipment, every tank goes through controlled manufacturing and quality inspection.

For us, a large order is not simply about quantity.
It is about delivering **consistent quality across all 98 units**.

🏭 Large-scale production capacity
🤖 Robotic + skilled manual welding
🔍 Strict leak testing & quality inspection
🛡️ Professional sandblasting & anti-corrosion coating
📦 Stable production and delivery capability

We manufacture customized **transformer oil tanks and radiators** based on customer drawings and technical requirements.

Looking for a reliable manufacturing partner for your next transformer project? Feel free to contact us.

28/08/2026

When you have worked at a transformer steel component factory, you can get...

24/08/2026

224 pad-mounted transformer tanks—now in full production. 🏭

For a large-volume order, the real challenge is not simply completing every tank. It is keeping the welding, coating quality and final appearance consistent throughout the entire batch.

This video shows several production stages currently underway at Nantong Zhihe Electric:

✅ Sandblasting for proper surface preparation
✅ C4H zinc-rich primer application
✅ Fine sanding and surface filling
✅ Topcoat application
✅ Full and continuous weld seams
✅ Detachable radiator and fl**ge design

From surface preparation to final finishing, each stage is carefully controlled to balance corrosion protection, structural reliability and a clean appearance.

For transformer manufacturers and project buyers, consistent batch quality means fewer inspection issues, smoother assembly and more predictable project delivery.

Planning a batch of custom pad-mounted transformer tanks? Send us your drawings and required quantity for a production review.

📩 [email protected]
🌐 www.ntzhelectric.com

🔍 **For 10–35 kV Transformer Tank Procurement, Consistency Matters More Than a Perfect Sample**When purchasing distribut...
21/08/2026

🔍 **For 10–35 kV Transformer Tank Procurement, Consistency Matters More Than a Perfect Sample**

When purchasing distribution transformer tanks in batches, one good sample is not enough.

The real concern is whether every tank will maintain the same dimensions, weld quality and corrugated-fin configuration. Even a small inconsistency can cause assembly delays, oil leakage risks or additional rework on the transformer production line.

That is why stable manufacturing processes matter. 🤖

For our **10–35 kV distribution transformer tanks**, robotic welding and dedicated production equipment help maintain consistent quality across the entire batch. Every finished tank is also leak-tested before delivery—not only the first unit. 💧

For purchasing teams, this means:

✅ Fewer unexpected problems during assembly
✅ Lower rework and inspection costs
✅ More predictable production schedules
✅ Consistent quality from the first tank to the last
✅ **Production time starting from 8–11 days**, depending on the drawings and order quantity

A reliable supplier should not simply produce one good transformer tank. They should be able to repeat that quality throughout the entire order—and deliver it within a clear production schedule. ⚡

📩 Send us your GA drawing or technical requirements for evaluation.

🚚 Case Sharing: Responding Fast to an Urgent Special Transformer Tank ProjectSpecial transformer oil tanks often require...
20/08/2026

🚚 Case Sharing: Responding Fast to an Urgent Special Transformer Tank Project

Special transformer oil tanks often require non-standard steel plates with specific thicknesses and dimensions. Unlike standard materials, these plates may have limited stock and longer purchasing cycles—making material availability a major challenge when the delivery schedule is tight.

For this project, our team quickly activated our established supply chain, coordinated closely with reliable steel suppliers, and accelerated material sourcing and transportation. Meanwhile, our technical and production teams completed drawing reviews, process planning and production preparation in parallel. ⚙️

Once the materials arrived and passed inspection, production started immediately. Although the schedule was urgent, no essential quality procedure was skipped. The tank went through strict dimensional inspection, controlled welding, surface treatment and 100% leak testing before shipment. ✅

We shortened the waiting time—not the quality-control process.

A reliable supply chain, flexible production planning and fast coordination helped us keep this customized project moving forward without compromising quality. 💪

Address

Hai'an, Nantong City
Nantong
226600

Alerts

Be the first to know and let us send you an email when ZHIHE Electric posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share