Ever wonder how deep foundation piles are constructed precision-by-precision?
From initial site leveling to the final concrete pouring, rotary drilling rigs are essential for stable and reliable structures. Watch our 3D animation breaking down the 12-step bored pile construction process:
📌 The Full 12-Step Breakdown:
1⃣ Construction preparation & site leveling
2⃣ Measurement lofting with total station
3⃣ Steel barrel / casing installation
4⃣ Mud pond & sedimentation tank layout
5⃣ Rig positioning & precision alignment
6⃣ Hole inspection (depth, diameter & inclination)
7⃣ First-time hole clearing
8⃣ Fabrication & installation of the steel cage
9⃣ Conduit / Tremie pipe installation & pressure testing
🔟 Secondary hole cleaning
1⃣1⃣ Concrete pouring via tremie method
1⃣2⃣ Casing & conduit retrieval for reuse
At Drillmaster, we design and supply reliable drilling equipment, casings, and accessories to power your foundation engineering projects seamlessly.