What happens between "Can I get a quote?" and the day your machine arrives? Here's the full Dession timeline — no black box.
📅 Day 1-3: Inquiry & Specification
We ask about your box sizes, board types, output targets, voltage, and language. You get a detailed quotation and machine recommendation.
📅 Day 4-10: Design Confirmation
For custom machines, our engineers confirm drawings and dimensions with you before production starts.
📅 Day 11-40: Production
Your machine is built with photos and videos shared at key stages, so you can watch it take shape.
📅 Day 41-50: 24-Hour Test Run + Factory Training
Your operators train on the actual machine. We test it under full load, then pack it for export.
📅 Day 51-70: Shipment + Installation
Your machine travels to your port, then our engineer installs, commissions, and trains your team on site.
Total: 7-10 weeks from inquiry to production-ready. You'll know where your machine is at every step.