10/01/2026
When Supplies moved to a taller building, they had to decide how to fill it.
Their packaging supply business had grown out of a facility in Mississauga, and the new 12,750 sq ft site in Scarborough gave them a lot more height to work with. They wanted as many pallet positions as the building would allow.
Our project representative, Mike Guernsey, put two options in front of them. One was selective racking, the same system they ran before and knew well. The other was double deep, which stores pallets two deep and cuts the number of aisles, turning more of the floor into storage.
They chose the double deep system, which increases the density, while still maintaining good accessibility. We used our rollformed product line, because it had been a good fit in the old building.
The finished system stands 28 feet tall and holds 1,192 pallet positions in 5,000 square feet of racking.
They are still growing. Choosing density now is what lets them stay in this building while they do.