Construction Disruption

Construction Disruption Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Construction Disruption, Building Materials, Toronto, ON.

05/29/2026

Zoning is one of the most misunderstood parts of building and development — yet it impacts everything from density, setbacks, approvals, and overall project viability.

If you’re working anywhere in the built environment, understanding this is essential. Here’s the 30-second breakdown. Save this for later. 📌

Follow Construction Disruption Show on YouTube — exploring housing innovation, development, construction technology, and the future of building through Kris Potts’ projects and industry investigations.

www.youtube.com/

05/27/2026

Affordable housing is one of the biggest challenges in construction today. Rising costs are forcing the industry to rethink how we build.

We’re exploring new technology designed to reduce build costs and make larger-scale housing projects more achievable — including a potential six-storey development.

Big vision. Calculated risk. Stay tuned.

05/25/2026

This empty Toronto lot is about to become a 6-storey modular build. 🏗️

We’re talking modular stairs, air tube elevators, faster construction timelines, and affordable housing done right — without cutting corners.

The future of construction is already happening in Toronto.

Follow Construction Disruption and subscribe to Kris Potts Official on YouTube so you don’t miss what’s next. 👀

https://www.youtube.com//videos

Would you live in a modular building?

05/21/2026

Have you been keeping up with the Construction Disruption Show? 👀🏗️
We’ve been busy behind the scenes working on new episodes, bigger conversations, and even more insight into the future of construction and technology.

If you haven’t already, check out our latest episode to catch up on what’s happening with the city and our property development project — and make sure to subscribe to the YouTube channel so you don’t miss what’s coming next. 🎥 https://youtu.be/tbYGunQ9Wbg?si=eJC5rYeS5tzJAHKB

Follow, like, and stay tuned… there’s a lot more on the way.
YouTube:

05/05/2026

Print a basement in 24 hours. Place a finished home on it the next day. Deliver it for under $350,000.

This isn't a concept. This isn't a prototype on paper. This is what we presented to Ontario's Ministry of Housing as the foundation of Project Livewell, a full ecosystem built to re-engineer how Canada designs, builds, and delivers homes at scale.

For an industry that has long operated the same way, this represents a genuine shift. Not just in technology, but in what we believe is possible when the right partners align around a shared goal.

The city is at the table. The technology is proven. The only thing left is ex*****on.

What would it take for your municipality to get behind something like this?

🎥 Watch the full episode now. https://youtu.be/tbYGunQ9Wbg?si=h1UXcYtSVMZTjyUY

05/01/2026

We assembled a world-class team, brought Canada's first Maxi printer to Toronto, and were ready to deliver a sixplex of affordable rental units. Then the opposition letters arrived.

The objections? Two extra units. Visitor parking. Floor area ratio.

This is the reality developers and builders face when trying to move the needle on Canada's housing shortage. Projects that align with municipal policy, serve low-income renters, and utilize cutting-edge construction technology, still getting buried in bureaucracy before they break ground.

The housing crisis won't be solved by approvals on paper. It will be solved when the systems and the people behind them actually let builders build.

What needs to change first, zoning policy, political accountability, or public perception? Drop your thoughts below.

🎥 Watch the full episode now. https://youtu.be/tbYGunQ9Wbg?si=h1UXcYtSVMZTjyUY

04/29/2026

We Can Build Homes in 24 Hours… But We Don’t

We had a 3D-printed, modular six-plex ready to go. Opposed by the councillor. This morning. 😤

We want affordability. But not density in our neighbourhoods. These two things clash.
The technology exists. The will doesn't.

We're rolling up our sleeves anyway. Change is hard, but someone has to push.

🎥 Watch the full episode now: https://youtu.be/tbYGunQ9Wbg?si=UAMjOyIqCoetezaO

👷 Construction Disruption | Toronto's unfiltered construction reality. 🔔 Follow for more.

What does Silicon Valley know about mass timber that we don’t?When some of the most advanced tech companies in the world...
02/14/2026

What does Silicon Valley know about mass timber that we don’t?

When some of the most advanced tech companies in the world start betting on wood instead of concrete, it’s worth paying attention.

Mass timber isn’t nostalgia. It’s precision manufacturing, faster assembly, lower carbon impact, and serious structural performance. From Google’s mass timber campuses to multi-storey builds rising across North America, something is shifting.

On this episode of Construction Disruption, we explore:

• Why engineered wood like CLT and glulam is gaining traction
• How factory precision improves speed and quality
• Why tech innovators are leaning into industrialized construction
• What this could mean for affordable housing at scale

Watch the short here:
https://youtube.com/shorts/55FM5-0Khbo

Wood is one of the oldest building materials in human history… so why is it suddenly powering some of the most innovative buildings in the world?In this epis...

Mass timber is no longer a concept. It’s a live job site, in winter, building real housing in Canada.In our latest episo...
02/07/2026

Mass timber is no longer a concept. It’s a live job site, in winter, building real housing in Canada.

In our latest episode of Construction Disruption, we step inside an active 8-storey mass timber building to see how CLT and glulam are changing what’s possible for mid-rise housing.

This is about speed, coordination, and industrialized construction done right. Floors going up in days. Factory precision on site. Teams working across disciplines instead of in silos.

Thank you to Leith Moore, Co-Founder of Assembly Corp., and the full project team:
• Design Builder: Assembly Corp.
• Client: WoodGreen Community Services
• Construction Management: Loftin Management
• Supply of Mass Timber: Element5
• Supply of Prefab Walls: Fab Structures
• Install of All Systems: Timber Panel Group Inc.
• Architect of Record: mcCallumSather

If we’re serious about building faster, better, and cheaper, this is what progress actually looks like.

Watch the full episode here 👉 https://lnkd.in/gKrZ8-5q

This link will take you to a page that’s not on LinkedIn

What if construction worked more like assembling Lego instead of starting from scratch every time?In this reel, we look ...
01/26/2026

What if construction worked more like assembling Lego instead of starting from scratch every time?

In this reel, we look at pre-manufactured building components that arrive finished, coordinated, and ready to install. No stair framing on site. No re-measuring. No chaos.

Less waste. Fewer delays. More certainty.

This is exactly the kind of system we’re searching for as we test real ways to build faster, cheaper, and better.

🎥 Watch the short: https://youtube.com/shorts/3SIGe3tYtEM

What do you think about pre-fab components like a staircase? Will it help solve for more affordable housing?

What if construction worked more like assembling Lego instead of framing everything from scratch?In this clip we look at pre-manufactured building components...

Address

Toronto, ON

Website

Alerts

Be the first to know and let us send you an email when Construction Disruption posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Construction Disruption:

Share