NUHA Engineering

NUHA Engineering "NUHA Engineering is your trusted partner in civil and structural engineering solutions.

Specializing in innovative design, construction, and project management, we are committed to delivering high-quality services for all your building and infrastructure

How to calculate per cubic meter steel bar.
25/07/2025

How to calculate per cubic meter steel bar.

Construction mistake
25/07/2025

Construction mistake

👷 Project Manager Vs Construction Manager1️⃣ Project Manager (PM) Tasks;1.Overall Project Oversight: The Project Manager...
07/06/2025

👷 Project Manager Vs Construction Manager

1️⃣ Project Manager (PM) Tasks;

1.Overall Project Oversight: The Project Manager is responsible for the entire lifecycle of the project, from planning and initiation through ex*****on, monitoring, and closing. They ensure that the project meets its objectives, is completed on time within budget.

2.Project Planning: The PM develops comprehensive project plans that outline scope, schedule, cost, quality, and risk management strategies.

3.Stakeholder Management: Project Managers work closely with various stakeholders, including clients, architects, engineers, and contractors.

4.Budget Management: The PM is responsible for creating and managing the project budget, including cost estimates, tracking expenses, and making adjustments to keep the project within financial constraints.

5.Risk Management: Identifying potential risks and developing mitigation strategies is a key task for Project Managers. They monitor risks throughout the project and take necessary actions to address them.

6.Contract Management: Project Managers oversee contracts with vendors, suppliers, and subcontractors, ensuring that all parties fulfill their contractual obligations.

7.Communication and Reporting: The PM is the primary point of contact for communication among all parties involved in the project.

8.Quality Assurance: Ensuring that the project meets the required quality standards is a critical responsibility for the Project Manager.

2️⃣ Construction Manager (CM) Tasks;

1.On-Site Management: The Construction Manager focuses on the day-to-day management of the construction site. They oversee the physical construction process, ensuring that the work is carried out according to the plans and specifications.

2.Supervising Construction Activities: The CM supervises and directs the construction workforce, including subcontractors, laborers, and equipment operators. They ensure that the construction work progresses according to schedule.

3.Site Logistics: The Construction Manager is responsible for organizing the logistics of the construction site, including the scheduling of material , equipment, and labor.

4. Safety Management: A key responsibility of the CM is ensuring that safety protocols are strictly followed on the construction site.

5. Coordination with Trades: The CM coordinates the work of various trades to ensure that all tasks are completed in the correct sequence.

6.Problem-Solving on Site: When issues arise during construction and also he is responsible for finding solutions to keep the project on track.

7.Quality Control on Site: The CM ensures that the work being carried out meets the required quality standards. They may conduct inspections and work closely with engineers to resolve quality issues
# # #

Basic Components of Bridge.                    engineering knowledge
28/04/2025

Basic Components of Bridge.

engineering knowledge

28/04/2025

Calculation of footing and reinforcement

If, Total Structure Load = 5000 KN in (Kg)
= 5000 x 101.97
= 509850 Kg
If Bearing, Capacity of Soil = 1800 Kg/m =
Area required for footings → Total Structure
Load/Bearing capacity
→ 509850/1800
→ 28.325m
Area for 1 footing Required Area for footing/ number of columns
= 28.395/9
→[3.147]
Size of footing → 3.147
Under root of 3.147 → 1.77m X 1.77m
Soil sub grade modulus = 7000 KN/m3 as
assumed
25mm for allowable settlement
REBAR SPACING
ТОР= 113 х 1000/1170.5 = 96.5 ~ 95 mm
( bar size)
BOTTOM = 90 mm ( bar size)

Materials calculation.
28/04/2025

Materials calculation.

Stirrup Information
28/04/2025

Stirrup Information

With Integrated Creative Architecture -ICA – I'm on a streak! I've been a top fan for 6 months in a row. 🎉
05/04/2025

With Integrated Creative Architecture -ICA – I'm on a streak! I've been a top fan for 6 months in a row. 🎉

Foundation Footing Layout Plan...                                                                                       ...
05/04/2025

Foundation Footing Layout Plan...

Beam Reinforcement Details...Stirrup & Rebar                                                                            ...
08/01/2025

Beam Reinforcement Details...
Stirrup & Rebar

Foundation:- Piling / Mat / Footing...Steps of Foundation Work....                                                      ...
08/01/2025

Foundation:- Piling / Mat / Footing...
Steps of Foundation Work....

Different types of loads.
02/01/2025

Different types of loads.

Address

DOHS, Mohakhali
Dhaka
1215

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Saturday 09:00 - 17:00
Sunday 09:00 - 17:00

Telephone

+8801714130720

Website

Alerts

Be the first to know and let us send you an email when NUHA Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share