31/10/2025
💥 Friday Update 💥
Sorry for the hiatus, however here are some cool projects we have been working on.
First of all is the biggest one to date, our first high profile job. Working alongside FRW Industrial to deliever some major steel remediation works on the Old Iron Bridge on the ABT Railway. Removing old plates and coming up with a simple future-proofing solution. We were tested with wild weather conditions but working alongside great people made it easy.
For any outside of the ordinary jobs with tough access, you cannot go past FRW Industrial, the level of expertise & experience is unmatched. Now with very exciting product they have just acquired “V-Deck” this job was made 200% easier. Thankyou Dave, Steve & Team.
Second on the list, and not any less exciting is our new implement trailer made for a customer. We must admit we’re absolutely chuffed with it, came up better than we had expected. Based on a 20ft container base, we have done some major modifications. Fitted with hydraulics to lower and raise the base & steel the rear axel. All coated in a 2 Pac paint, all done in house with the exception of plumbing up the hydraulics thanks to the top notch work of Ashley Aiken.
Also below we have a custom set of lightweight ramps we designed and fabricated to be able to load our truck onto a train wagon. Rated to 10t, they will now be an asset for the client.
We have also been reinvesting into the buisness, deveploping our forst of hopefully many weld procedures, new 100T hydraulic press, Pipe notcher, magnetic base drills and plenty more. Gearing up to broaden our capabilities even more.
Let us know what you think, we’re hoping to start these updates more regular again. Thankyou for your patience. ❤️